My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For each compaction lot of HMA when the CPF is less than 1.00, a Nonconforming <br /> Compaction Factor (NCCF) will be determined. THE NCCF equals the algebraic difference of <br /> CPF minus 1.00 multiplied by 40 percent. The Compaction Price Adjustment will be calculated <br /> as the product of the NCCF, the quantity of HMA in the lot in tons and the unit contract price <br /> per ton of the mix. <br /> 5-05 CEMENT CONCRETE PAVEMENT <br /> 5-05.1 Description <br /> Section 5-05.1 is supplemented with the following: <br /> This Work also includes constructing cement concrete pavement and 10-inch high cement <br /> concrete curb at Swift Stations at the location shown in the Plans. <br /> 5-05.2 Materials <br /> Section 5-05.2 is supplemented with the following: <br /> Concrete shall be high early-strength; obtain a minimum compressive strength of 2,500 psi <br /> within 48 hours of placement and 4,000 psi by 28 days. <br /> 5-05.3 Construction Requirements <br /> Section 5-05.3 is supplemented with the following: <br /> Cement concrete pavement and 10-inch high cement concrete curb at Swift Stations shall be <br /> constructed per standard plans and the details in the Plans. <br /> 5-05.4 Measurement <br /> Section 5-05.4 is supplemented with the following: <br /> Measurement for"Cement Concrete Pavement at Swift Station"will be by the cubic yard of <br /> finished surface of concrete pavement. No measurement will be made for the 10-inch high <br /> cement concrete curb. <br /> 5-05.5 Payment <br /> Section 5-05.5 is supplemented with the following: <br /> "Cement Concrete Pavement at Swift Station", per cubic yard. <br /> The unit contract price per cubic yard for"Cement Concrete Pavement at Swift Station" shall be <br /> full compensation for all costs to construct cement concrete pavement at Swift Stations per the <br /> Plans and these specifications including 10-inch high cement concrete curb, and costs to furnish <br /> and install ties/dowel bars. <br /> Curb and gutter transitions to Cement Concrete Curb for Swift Station will be measured and paid <br /> as Cement Concrete Traffic Curb and Gutter. <br /> Supplement Division 5 with the following: <br /> (March 9, 2016 APWA GSP) <br /> Swift Green Line—Corridor Stations Special Provisions SP78 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.