For each compaction lot of HMA when the CPF is less than 1.00, a Nonconforming <br /> Compaction Factor (NCCF) will be determined. THE NCCF equals the algebraic difference of <br /> CPF minus 1.00 multiplied by 40 percent. The Compaction Price Adjustment will be calculated <br /> as the product of the NCCF, the quantity of HMA in the lot in tons and the unit contract price <br /> per ton of the mix. <br /> 5-05 CEMENT CONCRETE PAVEMENT <br /> 5-05.1 Description <br /> Section 5-05.1 is supplemented with the following: <br /> This Work also includes constructing cement concrete pavement and 10-inch high cement <br /> concrete curb at Swift Stations at the location shown in the Plans. <br /> 5-05.2 Materials <br /> Section 5-05.2 is supplemented with the following: <br /> Concrete shall be high early-strength; obtain a minimum compressive strength of 2,500 psi <br /> within 48 hours of placement and 4,000 psi by 28 days. <br /> 5-05.3 Construction Requirements <br /> Section 5-05.3 is supplemented with the following: <br /> Cement concrete pavement and 10-inch high cement concrete curb at Swift Stations shall be <br /> constructed per standard plans and the details in the Plans. <br /> 5-05.4 Measurement <br /> Section 5-05.4 is supplemented with the following: <br /> Measurement for"Cement Concrete Pavement at Swift Station"will be by the cubic yard of <br /> finished surface of concrete pavement. No measurement will be made for the 10-inch high <br /> cement concrete curb. <br /> 5-05.5 Payment <br /> Section 5-05.5 is supplemented with the following: <br /> "Cement Concrete Pavement at Swift Station", per cubic yard. <br /> The unit contract price per cubic yard for"Cement Concrete Pavement at Swift Station" shall be <br /> full compensation for all costs to construct cement concrete pavement at Swift Stations per the <br /> Plans and these specifications including 10-inch high cement concrete curb, and costs to furnish <br /> and install ties/dowel bars. <br /> Curb and gutter transitions to Cement Concrete Curb for Swift Station will be measured and paid <br /> as Cement Concrete Traffic Curb and Gutter. <br /> Supplement Division 5 with the following: <br /> (March 9, 2016 APWA GSP) <br /> Swift Green Line—Corridor Stations Special Provisions SP78 <br /> May 2017 <br />