My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 6 <br /> STRUCTURES <br /> 6-02 CONCRETE STRUCTURES <br /> 6-02.3 Construction Requirements <br /> This section is supplemented with the following: <br /> 6-02.3(2)A Contractor Mix Design <br /> Concrete class 4000 shall be used for all reinforced concrete walls. Nominal maximum <br /> aggregate size shall be 3/4", except that 3/8" may be used for pump mixes. <br /> 6-02.3(14)A Class 1 Surface Finish <br /> All permanently exposed concrete surfaces shall receive a Class 1 surface finish. <br /> 6-11 REINFORCED CONCRETE WALLS <br /> 6-11.1 Description <br /> This section is supplemented with the following: <br /> This work also includes constructing reinforced concrete retaining wall Type I (Cut Wall), Type II <br /> (Fill Wall), in accordance with the details and wall number indicated on the plans <br /> This work also consists of constructing reinforced concrete retaining wall with Geofoam Fill, <br /> Type VI (Fill Wall No. 16 at Station 3019) and furnishing and constructing expanded polystyrene <br /> (EPS) geofoam lightweight embankment, and placing, sealing, and securing geomembrane <br /> around the expanded polystyrene (EPS) geofoam lightweight embankment. <br /> 6-11.2 Materials <br /> This section is supplemented with the following: <br /> Conform to the following for the construction of wall 16: <br /> Geofoam 9-37 <br /> Geomembrane 9-38 <br /> 6-11.3 Construction Requirements <br /> 6-11.3(1) Submittals <br /> This section is supplemented with the following: <br /> Geofoam <br /> Submit the following geofoam information to the Engineer at least 30 days before constructing <br /> geofoam embankment. Do not construct the geofoam embankment until the submittal is <br /> approved by the Engineer. <br /> (a)Working drawings. Provide working drawings that clearly show the following: <br /> Swift Green Line—Corridor Stations Special Provisions SP88 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.