Laserfiche WebLink
CONSTRUCTION TOLERANCES <br /> Place geofoam blocks to the lines and grades shown on the plans and working drawings <br /> to a tolerance of 1 inch of the indicated grade Place blocks such that there are no gaps <br /> larger than one-half inch in the vertical joints. <br /> ACCEPTANCE <br /> Furnish a production certification for the geofoam and submit to the Engineer for review. <br /> 6-11.4 Measurement <br /> This section is supplemented with the following: <br /> Reinforced concrete Retaining Wall No. XX, and Reinforced concrete Retaining Wall with <br /> Geofoam Fill No. 16 shall be measured per square foot of wall face, measured in the vertical <br /> plane from the bottom of wall to the top of wall. <br /> 6-111.5 Payment <br /> This section is supplemented with the following: <br /> Payment will be made in accordance with Section 1-04.1 for the following bid item(s): <br /> "Reinforced Concrete Retaining Wall No. XX", per square foot, where XX represents the <br /> retaining wall number indicated on the plans. <br /> "Reinforced concrete Retaining Wall with Geofoam Fill No. 16", per square foot. <br /> The unit contract bid price(s), including all incidental work, shall be full compensation for all <br /> labor, materials, tools and equipment necessary to satisfactorily complete the work as defined <br /> in the Standard Specifications and these Special Provisions. <br /> Structural Excavation Class A including haul, foundation preparation, footing, drain, geotextile, <br /> grout or concrete, reinforcing steel, and gravel backfill for wall shall be considered incidental to <br /> and included in the contract unit price of related wall, and no separate payment will be made. <br /> Furnishing and installing geofoam and geomembrane for Wall 16 as shown on the Plans and <br /> described in this Section shall be considered incidental to and included in the contract unit <br /> price of related wall, and no separate payment will be made. <br /> END DIVISION 6 <br /> Swift Green Line—Corridor Stations Special Provisions SP91 <br /> May 2017 <br />