Laserfiche WebLink
Special Provisions, shall be included in the applicable Stormwater Detention Tank System items <br /> of work. <br /> All costs for shoring for detention tanks shall be included in the bid item Shoring or Extra <br /> Excavation Class A. <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br /> 7-08.3 Construction Requirements <br /> Section 7-08.3 is supplemented with the following: <br /> Potholing <br /> Potholing shall be performed in advance of installing the storm drainage facilities. Should the <br /> Contractor fail to pothole in advance and a conflict occurs, the Contractor may be required to <br /> remove and re-install it at their own expense. <br /> 7-08.5 Payment <br /> Section 7-08.5 is supplemented with the following: <br /> Potholing shall be considered incidental to and included in the contract price of the storm <br /> drainage pipe and structures. <br /> 7-09 WATER MAINS <br /> 7-09.1 Description <br /> Section 7-09.1 is supplemented with the following: <br /> This work also includes relocating Alderwood Water &Wastewater District's (AWWD)water <br /> main and Silver Lake Water& Sewer District (SLWSD)water main at locations shown on the <br /> plans. <br /> Alderwood Water&Wastewater District <br /> Description, materials, and construction requirements for water mains noted as AWWD facilities <br /> in the Plans shall be in accordance with these special provisions and the AWWD General <br /> Provisions, Standards, and Details (AWWD Documents) included as Appendix C-5 of these <br /> contract documents. <br /> Silver Lake Water&Sewer District <br /> Description, materials, and construction requirements for water mains noted as SLWSD facilities <br /> in the Plans shall be in accordance with these special provisions and the SLWSD General <br /> Provisions, Standards, and Details (SLWSD Documents) included as Appendix C-7 of these <br /> contract documents. <br /> Where conflicts arise between the WSDOT Standard Specifications and "AWWD <br /> Documents"/"SLWSD Documents", the AWWD/SLWSD documents shall govern. <br /> Swift Green Line—Corridor Stations Special Provisions SP102 <br /> May 2017 <br />