My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7-09.2 Materials <br /> Section 7-09.2 is replaced with the following: <br /> Pipe material and appurtenances shall meet the requirements of Section 9-30 of these special <br /> provisions <br /> Bedding Material for Rigid Pipe (Di.) 9-03.12(3) <br /> Bedding Material for Flexible Pipe (PVC, HDPE) 9-03.13 <br /> Bank Run Gravel for Trench Backfill 9-03.19 <br /> Foundation Gravel 9-03.17, Class A <br /> Recycled concrete aggregates are not allowed for water line trench foundation, bedding, and <br /> backfill materials. <br /> 7-09.3 Construction Requirements <br /> 7-09.3(1) General <br /> Section 7-09.3(1) is supplemented as follows: <br /> Alderwood Water&Wastewater District <br /> All construction requirements for water mains shall be in accordance with Divisions 1, 2, <br /> and 7 of Alderwood Water&Wastewater District's Development Standards & <br /> Specifications, included as Appendix C-5 of these contract documents. <br /> Silver Lake Water&Sewer District <br /> All construction requirements for water mains shall be in accordance with Section I and II of <br /> Silver Lake Water&Sewer District Standards, included as Appendix C-7 of these contract <br /> documents. <br /> 7-09.3(19)A Connections to Existing Mains <br /> Section 7-09.3(19) is supplemented as follows: <br /> The Contractor shall connect to existing water main where indicated with the <br /> appurtenances shown on the plans. <br /> Contractor shall notify Alderwood Water&Wastewater District or Silver Lake Water& <br /> Sewer District for shutdown and system connection. <br /> Filling, flushing, pressure testing, and disinfection and purity testing shall be in accordance <br /> with specifications and details as specified in Division 2 of Alderwood Water&Wastewater <br /> District's Development Standards & Specifications or Section II of the Silver Lake Water& <br /> Sewer District Standards & Specifications. <br /> 7-09.4 Measurement <br /> Section 7-09.4 is supplemented with the following: <br /> Measurement for payment of pipe for water mains shall be by the linear foot of pipe laid and <br /> tested along the centerline through all fitting, valves and couplings. <br /> Swift Green Line—Corridor Stations Special Provisions SP103 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.