Laserfiche WebLink
2. Junction boxes, cable vaults and pull boxes shall be installed on a level 6-inch <br /> layer of crushed surfacing top course, in accordance with 9-03.9(3), placed on a <br /> compacted or undisturbed foundation. The crushed surfacing shall be compacted <br /> in accordance with Section 2-09.3(1)E. <br /> 3. After installation, the lid/cover shall be kept bolted down during periods when <br /> work is not actively in progress at the junction box, cable vault or pull box. <br /> 4. Before closing the lid/cover, the lid/cover and the frame/ring shall be thoroughly <br /> brushed and cleaned of all debris. There shall be absolutely no visible dirt, sand <br /> or other foreign matter between the bearing surfaces. <br /> 5. When the lid/cover is closed for the final time, a liberal coating of anti-seize <br /> compound shall be applied to the bolts and nuts and the lid shall be securely <br /> tightened. <br /> 6. Hinges on the Type 4, 5 and 6 junction boxes shall be located on the side of the <br /> box, which is nearest to the adjacent shoulder. Hinges shall allow the lid to open <br /> 180 degrees. <br /> Junction box lids shall have grounding lugs and be mechanically and electrically bonded. <br /> Section 8-20.3(8)Wiring <br /> Section 8-20.3(8) is revised as follows: <br /> 8-20.3(8) Wiring (PART A) These Special Provisions are based on Snohomish County <br /> requirements and apply to all work completed within the City of Bothell, the City of <br /> Everett, and unincorporated Snohomish County for the following bid items: <br /> "SR 527 at 208th Street SE (SR 524) Temporary System AND Traffic Signal <br /> Modifications, Complete," which shall include the following two systems: "SR 527 at <br /> 208th Street SE (SR 524) Temporary Traffic Signal System, Complete." <br /> "SR 527 at 208th Street SE (SR 524)Traffic Signal Modifications, Complete." <br /> "Airport Road at SR 99 (Evergreen Way)Traffic Signal Modifications, Complete." <br /> "Airport Road at 112th Street SW Traffic Signal Modifications, Complete." <br /> "Airport Road at Kasch Park Road Traffic Signal Modifications, Complete." <br /> "Airport Road BAT Lane Illumination System, Complete" <br /> The third paragraph is deleted and replaced with the following: <br /> All splices in underground illumination circuits and inductive loop circuits shall be <br /> installed in junction boxes. The only splice allowed in vehicle detection circuits shall be <br /> the splice connecting the detector lead-in conductors to the shielded home run cable. <br /> Splices for induction loop circuits shall be heat shrink type with moisture blocking <br /> material, sized for conductors. All connections with #10 and smaller wire shall use <br /> compression butt joint copper crimped connectors installed with a positive-action <br /> (ratchet) tool, except for quick disconnects as described in Section 9-29.7. The non- <br /> insulated die shall be an indent type and the insulated die shall be of a smooth shape <br /> capable of crimping pre-insulated terminals and connectors. The tool shall be a <br /> compound-lever type with a ratchet mechanism to ensure positive closure for the full <br /> crimping cycle. The tool shall be field adjustable to proper calibration with common tools <br /> and materials. Each individual conductor shall then have an approved waterproof heat- <br /> Swift Green Line—Corridor Stations Special Provisions SP125 <br /> May 2017 <br />