The shoring and boring pit plan shall be prepared by and bear the seal and signature of a <br /> Washington State licensed Professional Civil Engineer. <br /> Installed casing pipe shall be free from grease, dirt, rust, moisture and any other deleterious <br /> contaminants. <br /> Commercial concrete meeting the requirements of Section 6-02.3(2)B may be used to seal the <br /> casing. <br /> 8-20.3(6) Junction Boxes, Cable Vaults, and Pull boxes <br /> Section 8-20.3(6) is supplemented with the following: <br /> Unless otherwise noted in the Plans or approved by the Engineer, junction boxes, cable vaults <br /> and pull boxes shall not be placed within the traveled way or paved shoulders. <br /> All junction boxes, cable vaults, and pull boxes placed within the traveled way or paved <br /> shoulders shall be heavy-duty. <br /> Wiring shall not be pulled into any conduit until all associated junction boxes have been <br /> adjusted to, or installed in, their final grade and location, unless installation is necessary to <br /> maintain system operation. If wire is installed for this reason, sufficient slack shall be left to allow <br /> for future adjustment. <br /> Prior to installing new cables or reinstalling existing cables into new or existing cable vaults, pull <br /> boxes or junction boxes, the cable vault, pull box or junction box shall be cleaned of all dirt and <br /> debris. <br /> When junction boxes, cable vaults and pull boxes are installed or adjusted prior to construction <br /> of finished grade, pre-molded joint filler for expansion joints may be placed around the junction <br /> boxes, cable vaults and pull boxes. The joint filler shall be removed prior to adjustment to <br /> finished grade. <br /> When junction boxes, cable vaults or pull boxes are adjusted to finished grade, the six-inch <br /> gravel pad requirements shall be maintained. When existing junction boxes pull boxes or cable <br /> vaults do not have this gravel pad, or the gravel pad does not meet these specifications, a <br /> gravel pad, meeting these specifications shall be installed as part of the adjustment to finished <br /> grade. <br /> If junction boxes are placed in the sidewalk, they shall not be placed closer than 12 inches from <br /> the edge of any sidewalk or sidewalk joint. The frame and lid shall be from 0 to 3/16 inch below <br /> a straight edge laid across the sidewalk, and the lid shall be flat to a maximum of 1/16 inch <br /> positive camber. Premolded joint filler for expansion joints shall be placed around junction boxes <br /> installed in sidewalks. <br /> Heavy-duty Type 4, 5 and 6 junction boxes, cable vaults and pull boxes shall be installed in <br /> accordance with the following: <br /> 1. Excavation shall be sufficient to leave one foot in the clear between their outer <br /> surface and the earth bank. <br /> Swift Green Line—Corridor Stations Special Provisions SP124 <br /> May 2017 <br />