Laserfiche WebLink
COMMUNICATION DEVICES /ACCESSORIES <br /> Contractor shall confirm make/models with Community Transit IT department prior to ordering <br /> equipment. <br /> ROUTER <br /> The modem/cellular radio is built into the router. <br /> The router shall be a Cradlepoint COR 1 BR650 with 5 years of ECM— Prime support <br /> SWITCH—Network Switch <br /> The switch shall be a Blackbox LBH101A-H. <br /> Hardened Ethernet Switch. 4 Port 10/100Mbps <br /> Warranty: 1 year, option for extension <br /> PATCH PANEL: CAT 5E DISCONNECT PANEL <br /> The disconnect panel shall be a Blackbox JPM083A-R3, <br /> CAT5E wallmount patch panel 12-Port with Cover <br /> SURGE PROTECTOR <br /> The surge protector shall be a Echogear 8 outlet rotating-plug surge protector with <br /> fireproof technology and built-in cable management—2160 Joules of surge protection. <br /> ELECTRICAL UTILITY SERVICES <br /> COMPONENTS <br /> A. Meter Base conforming to utility company requirements. <br /> B. Other Components: As required by utility company. <br /> 8-32.3 Construction Requirements <br /> GENERAL <br /> REFERENCE STANDARDS <br /> A. NECA 1 - Standard for Good Workmanship in Electrical Contracting; National Electrical <br /> Contractors Association; 2006. <br /> B. NETA STD ATS -Acceptance Testing Specifications for Electrical Power Distribution <br /> Equipment and Systems; International Electrical Testing Association; 2007. <br /> C. NFPA 70- National Electrical Code; National Fire Protection Association; 2008. <br /> INSTALLATION <br /> A. Execute electrical work in strict accordance with the latest edition of the National Electric <br /> Code and governing local ordinances, codes, and regulations. Assure the strict conformity <br /> of Electrical equipment, materials, construction methods, tests, and definitions with the <br /> established standards of the following in their latest adopted revision: Underwriter's <br /> Laboratories, Inc., and the National Electrical Manufacturers Association. <br /> B. Provide all components and items in accordance with Electrical Utility Power and <br /> Telecommunication Utility installation requirements for a complete and workable <br /> Swift Green Line—Corridor Stations Special Provisions SP165 <br /> May 2017 <br />