installation. <br /> 1. Prior to preparing bid, obtain all utility installation information applicable to the work <br /> scope of this project. <br /> 2. Provide equipment, grounding, conduit, manholes, cabinets, and all components <br /> required by utility standards. <br /> C. Mounting details of equipment, devices, light fixtures, raceways, junction boxes and the <br /> like are not usually shown or specified. Provide per industry standard practice and code <br /> requirements as necessary for proper installation and operation the same as if herein <br /> specified or shown. <br /> D. Device or equipment mounting height given herein the Specifications, Contract Drawing, <br /> and/or documents are intended to provide general guidelines pursuant to industry <br /> standards. Such guidelines may not be exact or accurate and may or may not conflict with <br /> other trades installation without verification. <br /> E. Provide field coordination and verification with other contractors, trades, or any shop <br /> drawings, and ensure that such mounting heights if indeed are practical and feasible as <br /> not to conflict with other installation and construction. If conflicts are discovered at any <br /> time during the construction, report to the Owner's Representative immediately for <br /> resolution. <br /> F. If the Contractor fails to provide such coordination and field verification and results of <br /> erroneous installation, the Contractor shall remedy such installation per Owner's <br /> Representative direction, at Contractor's cost. <br /> MANUFACTURER'S DIRECTIONS <br /> A. Apply, install, connect, and erect manufactured items or materials according to the <br /> recommendations, wiring diagrams, instructions of the manufacturer when such <br /> recommendations are not illustrated or in conflict with the Contract Documents. <br /> B. Keep at the site not less than one copy, in good condition, of manufacturer's <br /> recommendations, wiring diagrams, instructions, or directions, pertaining to work at the <br /> site. Inform involved personnel of requirements and availability of manufacturer's <br /> recommendations. <br /> UTILITY STANDARDS <br /> A. All work associated with electrical power and telecommunications utilities shall be installed <br /> in accordance with the standards and specifications established by the serving utility. <br /> B. Contact electrical power and telecommunications utilities. Verify and coordinate work <br /> scope prior to commencement of installation. <br /> COORDINATION <br /> A. The drawings are diagrammatic and indicate generally the locations of materials and <br /> equipment. These drawings shall be followed as closely as possible. Coordinate the work <br /> under this section with the architectural, structure, plumbing, heating and air conditioning, <br /> and the drawings of other trades for exact dimensions, clearances, and roughing-in <br /> locations. Cooperate with other trades in order to make minor field adjustments to <br /> accommodate the work of others. <br /> B. Coordinate wiring interconnections for the complete operation of electrical-mechanical <br /> Swift Green Line—Corridor Stations Special Provisions SP166 <br /> May 2017 <br />