My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION <br /> A. Install panelboards in accordance with NEMA PB 1.1 and NECA 1. <br /> B. Install panelboards plumb. Install recessed panelboards flush with wall finishes. <br /> C. Provide filler plates for unused spaces in panelboards. <br /> D. Provide typed circuit directory for each branch circuit panelboard. Revise directory to <br /> reflect circuiting changes required to balance phase loads. <br /> E. Provide nameplates <br /> F. Provide spare conduits out of each recessed panelboard to an accessible location above <br /> ceiling. Identify each as SPARE. <br /> G. Ground and bond panelboard enclosure <br /> FIELD QUALITY CONTROL <br /> A. Perform field inspection and testing <br /> B. Inspect and test in accordance with NETA STD ATS, except Section 4. <br /> C. Perform inspections and tests listed in NETA STD ATS, Section 7.5 for switches, Section <br /> 7.6 for circuit breakers. <br /> ELECTRICAL SERVICE ENTRANCE <br /> REFERENCE STANDARDS <br /> A. NECA 1 - Standard Practices for Good Workmanship in Electrical Contracting; National <br /> Electrical Contractors Association; 2006. <br /> B. NFPA 70 - National Electrical Code; National Fire Protection Association; 2008. <br /> QUALITY ASSURANCE <br /> A. Perform work in accordance with utility company written requirements and NFPA 70. <br /> PRE-INSTALLATION MEETING <br /> A. Convene prior to commencing work of this section. Review service entrance requirements <br /> and details with Utility Company representative. <br /> SCOPE <br /> A. Prior to bid, contact Electric Utility and obtain installation standards. <br /> 1. Review requirements. <br /> 2. Include all components to satisfy utility requirements for a complete installation. <br /> B. Provide items not provided by the utility that may include, but are not limited to the <br /> following: <br /> 1. Trenching and backfill. <br /> 2. Underground conduit. <br /> 3. Vaults. <br /> 4. Wire. <br /> Swift Green Line—Corridor Stations Special Provisions SP176 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.