Laserfiche WebLink
5. Meter enclosure and conduit. <br /> PREPARATION <br /> A. Arrange with utility company to obtain permanent electric service to the Project. <br /> INSTALLATION <br /> A. Install securely, in a neat and workmanlike manner, as specified in NECA 1. <br /> B. Contractor shall install power conduit and pull wiring from the station to the service <br /> connection as shown in the plans including leaving sufficient excess wiring at the service <br /> connection. The power service provider, Snohomish County PUD, will be responsible for <br /> the service connection at the location shown in the plans. <br /> C. Power service conduit runs shall not exceed 270 degrees in bends without using a <br /> junction box. <br /> WIRING DEVICES <br /> REFERENCE STANDARDS <br /> A. NECA 1 - Standard Practices for Good Workmanship in Electrical Contracting; National <br /> Electrical Contractors Association; 2006. <br /> B. NEMA WD 1 - General Color Requirements for Wiring Devices; National Electrical <br /> Manufacturers Association; 1999 (R 2005). <br /> C. NEMA WD 6-Wiring Device-- Dimensional Requirements; National Electrical <br /> Manufacturers Association; 2002. <br /> D. NFPA 70- National Electrical Code; National Fire Protection Association; 2008. <br /> QUALITY ASSURANCE <br /> A. Conform to requirements of NFPA 70. <br /> B. Manufacturer Qualifications: Company specializing in manufacturing the products <br /> specified in this section with minimum three years documented experience. <br /> C. Products: Provide products listed and classified by Underwriters Laboratories Inc. as <br /> suitable for the purpose specified and indicated. <br /> EXAMINATION <br /> A. Device or equipment mounting height given herein the Specifications, Contract Drawing, <br /> and/or documents are intended to provide general guidelines pursuant to industry <br /> standards. Such guidelines may not be exact or accurate and may or may not conflict with <br /> other trades installation without verification. Provide field coordination and verification with <br /> other divisions. <br /> 1. Verify counter heights with cabinet installer and cabinet shop drawings, prior to <br /> rough-in for outlets. <br /> 2. Examine other trades shop drawings to ensure that such mounting heights are <br /> appropriate for the intended device use, and the device location do not conflict with <br /> other components. Immediately report impaired device use and conflict/location to <br /> Swift Green Line—Corridor Stations Special Provisions SP177 <br /> May 2017 <br />