Laserfiche WebLink
PROTECTION <br /> A. Relamp luminaires that have failed lamps at Substantial Completion. <br /> EXTERIOR LIGHTING <br /> REFERENCE STANDARDS <br /> A. ANSI C78.379-American National Standard for Electric Lamps-- Reflector Lamps-- <br /> Classification of Beam Patterns; 2006. <br /> B. ANSI C82.1 -American National Standard for Lamp Ballast- Line Frequency Fluorescent <br /> Lamp Ballast; 2004. <br /> C. ANSI C82.4-American National Standard for Ballasts for High-Intensity-Discharge and <br /> Low Pressure Sodium Lamps (Multiple-Supply Type); 2002. <br /> D. ANSI 05.1 -American National Standard for Wood Poles-- Specifications and <br /> Dimensions; 2002. <br /> E. IESNA RP-8-American National Standard Practice for Roadway Lighting; Illuminating <br /> Engineering Society of North America; 2000(R2005) (ANSI/IES RP8). <br /> F. NECA/IESNA 501 - Recommended Practice for Installing Exterior Lighting Systems; 2006. <br /> G. NFPA 70- National Electrical Code; National Fire Protection Association; 2008. <br /> SUBMITTALS <br /> A. Shop Drawings: Indicate dimensions and components for each luminaire that is not a <br /> standard product of the manufacturer. <br /> B. Manufacturer's Installation Instructions: Indicate application conditions and limitations of <br /> use stipulated by product testing agency. Include instructions for storage, handling, <br /> protection, examination, preparation, installation, and starting of product. <br /> QUALITY ASSURANCE <br /> A. Conform to requirements of NFPA 70. <br /> B. Electrical Components: Listed and classified by Underwriters Laboratories Inc. as suitable <br /> for the purpose specified and indicated. <br /> INSTALLATION <br /> A. Install fixtures securely, in a neat and workmanlike manner, as specified in NECA 501. <br /> B. Install lamps in each luminaire. <br /> C. Bond luminaires and metal accessories to branch circuit equipment grounding conductor. <br /> D. Seal around top of Wall Sconces at column. <br /> FIELD QUALITY CONTROL <br /> A. Operate each luminaire after installation and connection. Inspect for improper connections <br /> and operation. <br /> Swift Green Line—Corridor Stations Special Provisions SP181 <br /> May 2017 <br />