Laserfiche WebLink
9-29 (PART A) — Illumination, Signal, Electrical - These Special Provisions are based on <br /> Snohomish County requirements and apply to all work completed within the City of <br /> Bothell and the City of Everett, for the following bid items: <br /> "SR 527 at 208th Street SE (SR 524) Temporary System AND Traffic Signal <br /> Modifications, Complete," which shall include the following two systems: "SR <br /> 527 at 208th Street SE (SR 524) Temporary Traffic Signal System, Complete"And <br /> "SR 527 at 208th Street SE (SR 524)Traffic Signal Modifications, Complete." <br /> "Airport Road at SR 99 (Evergreen Way)Traffic Signal Modifications, Complete." <br /> "Airport Road at 112th Street SW Traffic Signal Modifications, Complete." <br /> "Airport Road at Kasch Park Road Traffic Signal Modifications, Complete." <br /> "Airport Road BAT Lane Illumination System, Complete" <br /> "Relocate Existing Signal Loops on SR 527 at 180th Street SE Northbound." <br /> "Relocate Existing Interconnect— " at each of the following <br /> locations: <br /> • SR 527 at 196th Street SE Southbound <br /> • SR 527 at 196th Street SE Northbound <br /> • 128th Street SW at 4th Avenue W. Northbound/Westbound <br /> • Airport Road at SR 99 Southbound <br /> • Airport Road at 112th Street SW Southbound <br /> • Airport Road at 100th Street SW Southbound <br /> • Airport Road at Kasch Park Road Southbound <br /> "Relocate Existing Detection Loop Conduit with Wire- " at each of <br /> the following locations: <br /> • SR 527 at 196th Street SE Southbound <br /> • SR 527 at 196th Street SE Northbound <br /> • SR 527 at 180th Street SE Southbound <br /> "Relocate Existing Illumination Conduit— " at each of the following <br /> locations: <br /> • SR 527 at 220th Northbound <br /> • 128th Street SW at 4th Avenue W. Southbound/Eastbound <br /> • Airport Road at 112th Street SW Southbound <br /> "Remove and Relocate Existing Luminaire" at each of the following locations: <br /> • SR 527 at 208th Street SE (SR 524) Southbound <br /> • SR 527 at 180th Street SE Southbound <br /> 9-29 (PART B) — Illumination, Signal, Electrical - These Special Provisions are based on <br /> WSDOT Northwest Region requirements and apply to all work completed on the <br /> following bid items: <br /> Swift Green Line—Corridor Stations Special Provisions SP190 <br /> May 2017 <br />