My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meeting Minutes <br /> o a Meeting: Swift II BRT—Utility Coordination Meeting <br /> Project No.: 32130T <br /> 11241 willows road ne Meeting Date: Thursday,September 15,2016 <br /> suite 200 <br /> redmond,wa 98052 <br /> phone(425)822 4446 Meeting Time: 1:00 pm <br /> fax(425)827-9577 <br /> Location: Community Transit <br /> Attendees: Scott Smith (Mill Creek),Gary Vervalin (Wave),Joe <br /> Fordon&Kevin Sowa(Comcast),John Gregory <br /> (PUD),Wasim Khan (City of Bothell),Euneka <br /> Richards &Hailey Kimball (City of Everett), <br /> Muhammad Uddin&Bin Lee (Snohomish County), <br /> Parker Indorf(PSE),Windi Shapley,Matt Scarsella <br /> &Sam Chapman (Otak),Todd Jacobs &Roger Kee <br /> (CT),Paul Richard&Dan Scheil (AWWD),Brandon <br /> Henson (MWWD),Brian Smith (Frontier),Rick <br /> Gilmore&Ron Beyer (SLWSD) <br /> Minutes By: Sam Chapman; Otak,Inc. <br /> 1) Project Status and Schedule <br /> • Provided utility companies with sets of utility coordination plans for the Corridor Station <br /> Improvements and 128th Street Improvements at I-5 <br /> • Presentation/overview of the Community Transit Swift II BRT—Boeing to Canyon Park <br /> Project <br /> • Utility companies will review utility coordination plans and provide comments by <br /> September 30,2016. <br /> • Utility design coordination to be completed by February 2017. <br /> • Utility relocation and service coordination to be completed by November 2017. <br /> • Service application coordination will begin November 2017. <br /> 2) Key Discussion Topics <br /> • AWWD noted that they have water lines running under concrete pads not shown in <br /> Survey.AWWD will review and return comments to CT/Otak. <br /> • All proposed communications/traffic signal fiber optic lines will require connection to <br /> an existing spliced fiber line location. <br /> • Water and Sewer districts have emphasized Swift shelter/roof cannot interfere with long- <br /> term maintenance of existing and proposed SSMH. Design will have to accommodate <br /> access for large maintenance vehicles directly over manholes. <br /> x:\project\32100\32130T\Admin\Meetings\Utility Coordination\16_0915-Utility Coordination Meeting <br /> Minutes.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.