Laserfiche WebLink
Meeting Minutes I <br /> August 95, 2096 Page 2/ <br /> • Comcast and Frontier have agreed to meet out in the field with CT/Otak to coordinate <br /> and identify existing utilities at all stations. UPDATE—Meeting was held on September <br /> 28th <br /> • CT/Otak will meet with AWWD to coordinate utility relocation and design. Date is <br /> TBD. <br /> • CT/Otak will meet with SLWSD to coordinate utility relocation and design. Date is <br /> IBD. <br /> 3) 128th St Improvements at I-5 <br /> • AWWD has concerns regarding the cast iron water main that runs along 128th Street <br /> both east and west of I-5. <br /> o Major concern includes rupture of aging(brittle) cast iron pipe after or <br /> during construction of the proposed improvements. Paul Richard and Dan <br /> Schen have proposed replacement of the existing system concurrently with <br /> the 128th Street Improvements project. <br /> o The contractor will install the new water facilities systems by AWWD <br /> standards, and will require contracts and negotiation. AWWD will pay for the <br /> cost of design and construction of the water line replacement and will be <br /> inspecting the work. <br /> • PSE Gas shows existing gas main to the north not shown in survey. Gas line crosses at <br /> approximately station 101+10 going north,and turns eastward until heading north again <br /> up the right lane of 4`"Ave W. Existence of gas main does not impact the proposed <br /> improvements. Otak Survey will add gas main to the basemap. <br /> • PSE Gas has requested additional potholing,located at station STA 103+67, 70' RT. <br /> 4) SB SR 527 at SR 524/208`St SE <br /> • Station#3051 -PSE Gas has requested additional potholing at station 12+86,5'LT. <br /> This gas service crosses proposed storm drainage pipe. <br /> 5) 132nd St SE at 16th Ave SE <br /> • Station#3045 - SLWSD has proposed rerouting the existing sanitary sewer main at SB <br /> 132"d and 16th either in front of or behind the proposed Swi t shelter for maintenance <br /> accessibility. Rick Gilmore and Ron Beyer will discuss further with CT/Otak during a <br /> separate coordination meeting with SLWSD. <br /> 6) SR 527 at 164th St SE <br /> • Station#3048—8" conc. sewer line heading out NW (IE=269.32) of 48"manhole <br /> (RIM=287.12) believed to be in a casing which will influence relocation design. Otak and <br /> AWWD will meet to discuss proposed options for design. <br /> K:\project\32100\32130T\Admin\Meetings\Utility Coordination\16_0915-Utility Coordination Meeting Minutes.doc <br />