Laserfiche WebLink
Allowable Soil Bearing Pressure <br /> (psf) <br /> Allowable Lateral Founded at a Founded at a <br /> Bearing Pressure Friction Angle Depth of Depth of 9 or <br /> Location (psf) (degrees) 6 feet more feet <br /> Airport Road and 112th Street SW 1,500 28 1,500 2,500 <br /> Airport Road and Kasch Park Road 1,500 30 1,500 2,500 <br /> Notes: <br /> 1 Based on our review of public information regarding the existing landfill perimeter and the proposed signal pole location,the <br /> foundation appears to be outside the landfill area.Similar to the station foundation preparation in this area,we recommend potholes <br /> be planned to locate either native soil or the landfill liner prior to drilling new foundations. <br /> 2 At the northeast corner of 132nd Street SE and 16th Avenue SE,peat was encountered from a depth of 9 to 12 feet.Therefore,at this <br /> corner we recommend that the signal pole foundation extend to a minimum depth of 15 feet below existing grade. <br /> Timber Strain Poles <br /> We understand that timber strain (span wire) poles will be used in the northwest and southwest corners of <br /> the intersection of SR 527 and 208th Street SE. In general, medium dense sand and gravels are anticipated <br /> in this area. The standard span wire design assumes a soil lateral bearing pressure of 2,000 psf and a <br /> friction angle of 32 degrees. In our opinion, these design parameters are appropriate for this intersection. <br /> Gravelly soils were encountered at the southwest intersection corner; it might be difficult to install poles in <br /> this area using open hole techniques. <br /> Luminaire Poles <br /> Luminaire poles are planned along Airport Road east of SR 99.The lateral bearing values presented above <br /> in Table 10 may also be used for design of the luminaire poles. The recommended values for this area <br /> along Airport road will result in using a Type B pole design. <br /> Construction Considerations <br /> We recommend that signal pole foundations have a minimum diameter of 3 feet and be installed using the <br /> WSDOT procedure. Concrete should be cast neat against excavation sides. The use of temporary casing, <br /> drilling mud or other types of procedures should be used, as necessary, to control sloughing of sidewalls. <br /> Slough should be removed from the bottom of the excavation prior to placement of concrete, as loose or <br /> disturbed soil in the excavation base could result in increased settlement. <br /> Structures that require relatively short shafts(less than 9 feet deep) may be formed and constructed in an <br /> open excavation provided seepage is not present and the excavation remains stable. The backfill placed <br /> around the foundation in the excavation must be compacted in accordance with the WSDOT Standard <br /> Specification M41-10, Section 2-09.3(1)E and as described in this report. Foundation construction should <br /> be in accordance with WSDOT Standard Specifications M41-10, Sections 8-20.3(2) and 8-20.3(4). <br /> Following the removal of the concrete forms (the forms may be left in place ONLY if corrugated metal pipe <br /> is used), compacted backfill should be placed around the shaft to provide containment. Controlled density <br /> fill may be used as an alternative for structural backfill. <br /> GEOENGINEERSri) April 14,2017 Page20 <br /> File No.2095-032-00 <br />