My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE Geotech Report 2022-10-25
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
Geotech Report
>
11831 AIRPORT RD WHOLE SITE FILE Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:26:21 AM
Creation date
6/18/2019 2:44:53 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> INTRODUCTION AND PROJECT DESCRIPTION 1 <br /> FIELD EXPLORATIONS AND LABORATORY TESTING 1 <br /> Field Explorations 1 <br /> Laboratory Testing 2 <br /> PREVIOUS STUDIES 2 <br /> SITE CONDITIONS 2 <br /> Setting 2 <br /> Geology 3 <br /> Surface Conditions 3 <br /> Pavement Conditions 3 <br /> Subsurface Soil and Groundwater Conditions 5 <br /> Canyon Park Park-and-Ride and SR 527 at 220th Street SE 5 <br /> SR 527 at SR 524 5 <br /> SR 527 at 196th Street SE 6 <br /> SR 527 at 180th Street SE 6 <br /> SR 527 at 164th Street SE 6 <br /> SR 527 at 153rd Street SE and SR 527 at Trillium Boulevard 7 <br /> 132nd Street SE at 16th Avenue SE 7 <br /> 132nd Street SE at Elgin Way/Dumas Road 7 <br /> 128th Street SE at 3rd Avenue SE 7 <br /> 128th Street SE widening at 1-5 8 <br /> 128th Street SW at 4th Avenue West 8 <br /> Airport Road/128th Street SW at East Gibson Road 9 <br /> Airport Road at SR 99 9 <br /> Airport Road at 112th Street SW and Airport Road at 100th Street SW 9 <br /> Airport Road at Kasch Park Road 9 <br /> Groundwater Conditions 10 <br /> CONCLUSIONS AND RECOMMENDATIONS 10 <br /> Summary of Geotechnical Considerations 10 <br /> Earthquake Engineering 10 <br /> Design Earthquake Parameters 10 <br /> Seismic Hazards 11 <br /> Station Retaining Walls 11 <br /> Anticipated Soil Conditions 11 <br /> Foundation Support and Subgrade Preparation 12 <br /> Design Parameters 12 <br /> Wall Drainage 13 <br /> Other Considerations 14 <br /> Wall 1 and 2 Cast-in-Place Walls 14 <br /> Wall Drainage 16 <br /> Wall 2 Soldier Pile Wall 16 <br /> Design Recommendations 16 <br /> GEOENGINEERS_ri April 14,2017 P Page i <br /> File No.2095-032-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.