Laserfiche WebLink
Lagging. 17 <br /> Drainage 18 <br /> Construction Considerations 18 <br /> Signal Poles 18 <br /> Design Considerations 18 <br /> Timber Strain Poles 20 <br /> Luminaire Poles 20 <br /> Construction Considerations 20 <br /> Earthwork 21 <br /> Earthwork Considerations 21 <br /> Clearing and Grubbing 21 <br /> Subgrade Preparation 21 <br /> Structural Fill Materials 22 <br /> Underground Utilities 24 <br /> Temporary Slopes 24 <br /> Benching 25 <br /> Permanent Slopes 25 <br /> Site Drainage 25 <br /> Infiltration Evaluation 25 <br /> Pavement Design 26 <br /> Subgrade Preparation 26 <br /> New Hot-Mix Asphalt Pavements 26 <br /> Erosion and Sedimentation Control 26 <br /> LIMITATIONS 27 <br /> REFERENCES 27 <br /> LIST OF FIGURES <br /> Figure 1.Vicinity and Site Key Map <br /> Figures 2A through 2R.Site Plans <br /> Figure 3. Earth Pressure Diagram <br /> APPENDICES <br /> Appendix A. Field Explorations <br /> Figure A-1 - Key to Exploration Logs <br /> Figures A-2 through A-23 - Log of Borings <br /> Figures A-24 through A-29 - Log of Hand Augers <br /> Figures A-30 through A-32 Log of Monitoring Wells <br /> Figures A-33 and A-34 - Log of Test Pits <br /> Appendix B. Laboratory Testing <br /> Figures B-1 through B-4 - Sieve Analysis Results <br /> Appendix C. Infiltration Technical Memorandum <br /> Appendix D. Previous Explorations <br /> Appendix E. Report Limitations and Guidelines for Use <br /> GEOENGINEERSi April 14,2017 Page ii <br /> File No.2095-032-00- <br />