My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8009 BEVERLY BLVD 2019-06-19
>
Address Records
>
BEVERLY BLVD
>
8009
>
8009 BEVERLY BLVD 2019-06-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2019 7:45:41 AM
Creation date
6/19/2019 7:45:37 AM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
8009
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the basement.Additionally,the two swinging doors function like actual doors and not like <br /> current garage doors. <br /> Finally,the only real issue at hand with this is the doors themselves. I have added information <br /> regarding replacing them with a slider that meets current standards.All other walls were always <br /> insulated in the same manner as the basement proper and, by drawing, will continue to be <br /> insulated in that fashion. <br /> Please reference the drawing for these additions. <br /> 3. Text: "Label all spaces for the intended use." <br /> All spaces on the drawing are in fact labeled. No intended usage is left unlabeled. <br /> 4. Text: R310.1 Emergency escape and rescue required. <br /> Supplemental Flag Note#1 and#2 added to Drawing to reflect the fact that window and/or <br /> doors of living rooms meet height requirements of R310.1 <br /> 5. Re: Fire-blocking. <br /> R302.11,which deals with Fire-blocking, does not require that fire-blocking be shown in <br /> drawings. <br /> Despite this,Supplemental Instruction#3 has been added to state that fire-blocking will be <br /> accomplished per R302.11 and under supervision of City of Everett Inspection Services. <br /> 6. R302.7 Under Stair Protection <br /> Supplemental Instruction#4 has been added to state that under-stair protection will be added <br /> per R302.7 and under supervision of City of Everett Inspection Services. <br /> 7. RE: Site Plan <br /> Site plan was submitted and fulfilled all parts of City of Everett Site Plan Checklist. Further,this <br /> item was in fact approved by the Site Planner for the City of Everett. <br /> Additionally, in our conversation of 7/19/16, I personally added outlines for the driveway in the <br /> rear of the property and updated the impervious area calculations accordingly. <br /> 8. Re: Walls <br /> Building is in fact over 5'0"from property line as marked by official surveyors point in ground at <br /> property. <br /> / °,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.