My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/06/19 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/06/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 9:29:11 AM
Creation date
6/21/2019 9:27:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> 2 <br /> Shoreline Public Access Project Summary <br /> Shoreline Section Status Participants Cost 1 2 <br /> 3 Notes <br /> Completed City,Port, $$$ X Parking,beach access,benches,Porta Potties <br /> 1.0 Edgewater Beach at P Others $ <br /> Boeing Pier , a to BNSF storage vardwiff► <br /> $ <br /> 13 Harbrxview Parc-ad`acent BS laked ate'lacks rat-meso <br /> road Rehab bridge over RR and restored nearshore <br /> 1.5 Howarth Pads Access Bridge Completed <br /> MRC X and beach <br /> and Bear#_Restoration <br /> X Unfunded project in City's TIP <br /> 2.1 Pigeon Creek No.1 Design study City,Port, $$ <br /> Over/Underpass across completed BNSF <br /> BNSF to beach X Port closes 1 mi.paved trail at night for security <br /> 2 2 Pigeon Creek#1 to Completed Port,City $$ at pocket beach with picnic tables and benches. <br /> Terminal Ave. 25th St overcrossing of Marine View Dr.; <br /> 2.3 Terminal Ave,to Completed. Port,City $$ X sidewalks and other ped improvements <br /> St..Marine View Dr.r. <br /> overcrossing Under litigation to restore public access <br /> 2.4 Bond St !! Ave street Ongoing BNSF,City $ X <br /> eivz negotiations <br /> Port,City $$ X Widened ped/bike on west side of W.Marine <br /> • <br /> 3.1 Harbor Trail to N.Marina Completed View Dr.(Everett Av-23rd St) <br /> X Phase 1 completed with walkways and deck <br /> 32 Bayside Park Improvements Completed City,Others $$ overlook;Phase 2 not funded <br /> Port $$ X X Phase 1 done;Phase 2 under construction;Phase 3 <br /> 3.3 North Marina master plan Under going to bid for construction <br /> (Waterfront Place) construstiori <br /> X Construction 1p be completed in 2019 <br /> 3.4 Grand Ave Park overpass Under City,Port $$$ <br /> to waterfront construction BNSF <br /> City X 1 mile ped/bike paved flail connects north and <br /> 3.5 Marine View Drive Trail Completed south view parks <br /> (portion of Mill Town Trail) <br /> 4.1 City Utility Building <br /> City $ X <br /> 4.2 Elevated Wooded Area <br /> Others $ X Potential stop on IVO Town Trail <br /> X Gravel parking area with access to mud flats <br /> 4.3 Jeld-Wen to Railroad Completed City,Port,BNSF $ <br /> Service Road <br /> Port $$ Possible future view point when property <br /> 4.4 Baywood Spur developed <br /> $ X Mill Town Trail shares sidewalk <br /> 4.3 Sidewalk Trail Completed City <br /> 4.6 North Point <br /> City,BNSF $$$ X Trail alternatives includes boardwalk over water <br /> City,Port, $$$ X Possible future trail when property redeveloped <br /> 4.7 Weyerhaeuser Site Others <br /> 4.8 RR Delta Crossing <br /> City,BNSF $$$ X Overhead ramp crossing of RR with throw fence <br /> 4.9 Bridge Entry to former <br /> City,BNSF $$ Possible future trail when property redeveloped <br /> Weyerhaeuser site <br /> 2 <br /> Shoreline Public Access Plan Update 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.