My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/06/19 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/06/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 9:29:11 AM
Creation date
6/21/2019 9:27:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shoreline Section Status Participants Cost 1 2 3 Notes <br /> 4.10 SR 529 Bike/Ped improve City,Others $$$ X Possible future trail when property redeveloped <br /> crossing $ <br /> 5.1 Riverside Business Park Trail design City,Port, $$ X Waterfront trail construction in 2019 <br /> completed Others <br /> 5.2 Port Access Bridge to City,Port, $ X Throw fence over RR track completed <br /> Riverside Business Park BNSF Ana.2018 <br /> • <br /> 5.3 West Channel City,Port $$ X Construct trail along shoreline <br /> 5.4 Trail Around Wetland City $ X Construct foot access to viewpoint on western <br /> margin of City property without adverse impact <br /> to valuable wetland <br /> 5.5 Pinch Point City,BNSF $$$ X <br /> 5.6 Bridge to Langus City,Others $$$ X <br /> Park $ <br /> 6.2 23rd Street City,Others $$$ x Include ped/bike area if overpass constructed for <br /> Connection redevelopment <br /> 6.3 Everett Avenue City,Others $$$ X <br /> . Connection <br /> 6.4 Street-End Viewpoint City $ X <br /> 6.5 Riverpoint to Bridge City $ X <br /> 6.6 Highway 2 to Everett Station Phase I City $ X Widened sidewalk along Pacific Ave.to connect <br /> completed with Everett Station <br /> 7.1 Trail at Eclipse Mill;new Park designed City,Others $$ Eclipse WI Park named and under design <br /> • rift Dark <br /> 72 36th Street Connection Completed City,BNSF $$ <br /> 7.3 Lowell Riverfront Trail Completed City X <br /> 7.4 Connection to Completed City,Others $$$ X <br /> Interurban Trail <br /> 7.5 Lenora St Overcrossing City,Others $$ X Only if bypass is constructed • <br /> 8.1 Rotary Park Exit Completed City $ X Bike/ped trail beside parking access road <br /> 8.2 Lowell River Road Preliminary City,Others $$ X x Working with Snohomish County to design <br /> discussions bike trail to connect to Snohomish <br /> 92 Tidal restoration on Smith Completed City.Corps Setback dice raised to 15 it for Civ s Water <br /> Island Pollution Control Facility with 4.000 it pad trail <br /> extension along Union Slouch <br /> 9.3 Smith Island Enhancements Completed City.Corps Trail extension north of Carious Riverfrant Park on <br /> top of dice:public shoreline access loop from 12th <br /> St to south hoof island conneclna to bridge to <br /> Spencer Island at 4th St <br /> 10 SR 527 Expansion Completed City.Otters Additional 9.7110 R of bike lane and sidewalk;kale <br /> table and hand carry boat access on east bank of <br /> Silver Lake <br /> Shoreline Public Access Plan Update 2019 1 o 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.