Laserfiche WebLink
City of Everett <br /> Floyd Snider Environmental Services <br /> EXHIBIT A—ADDITIONAL SCOPE OF WORK AND FEE ESTIMATE <br /> 5/29/2019 <br /> City of Everett <br /> Floyd I Snider Environmental Services <br /> Amendment No. 5 to the existing Scope of Work <br /> COEv-ENV1 — Kimberly-Clark Mill Site Consultation <br /> BACKGROUND <br /> Under a Professional Services Agreement (PSA) dated 11/11/2012, Floyd Snider (F IS) provides <br /> environmental consulting services associated with the City of Everett (City) deep water outfall <br /> formerly shared with Kimberly-Clark (K-C); and environmental issues associated with the former <br /> Kimberly Clark mill site including support for property transaction. With Amendment No. 5 to <br /> the PSA, F IS will provide the additional services listed below, on a time and materials basis. <br /> Task 3000— K-C Mill Utility Property Acquisition Support (New Task) <br /> Scope: F IS will provide continued environmental consulting services to support the City in <br /> acquisition of the "Utility Property" at the north end of the K-C Mill Site. F IS Services will <br /> include assistance during due diligence review, supplemental environmental characterization, <br /> support for existing swale removal, negotiation support, and coordination with the Department <br /> of Ecology. These services are detailed further below: <br /> • Review of due diligence documents provided by K-C. Preparation of summary of <br /> findings to be transmitted to environmental and legal representatives at the City. <br /> Participation in the due diligence site inspection. <br /> • Support in K-C negotiations regarding environmental matters during the due diligence <br /> period. <br /> • Environmental consulting support for the City's execution of the "Swale Work" as <br /> defined in Exhibit P of the Purchase and Sale Agreement between the City and K-C. <br /> o Preparation of a Sampling and Analysis Plan (SAP) for the work that details the <br /> swale material and post-excavation conformational sampling. Coordination with <br /> Ecology. <br /> o Coordination with City in preparation of a work plan to excavate the entire <br /> length of the swale from the lift station to west retaining wall and backfill the <br /> area. The City will provide a plan to construct a drainage barrier between the <br /> properties and to install and operate a drainage collection system. F15 will <br /> provide construction oversight during the excavation. Work includes: <br /> C:\Users\msadler\AppData\local\Microsoft\W Indows\INetC <br /> ache\Content.Outlook\5UK05U15\FS SOW Amendment S Scope of Work—Amendment 5 <br /> 052919.docx <br /> Page 1 of 3 <br />