Laserfiche WebLink
, <br /> Members of our geotechnical staff observed the geotechnical-related tasks identified above on an <br /> intermittent and on-call basis. Their observations are summarized in field reports,which were <br /> provided to the design and construction team members and are on file in our office. <br /> To the extent observed, the construction outlined above was completed in general conformance <br /> with the intent of the project plans, specifications, and our geotechnical engineering <br /> recommendations. <br /> ♦ ♦ ♦ <br /> We appreciate the opportunity to work with you on this project. Please call if you have questions <br /> concerning the information provided. <br /> Sincerely, <br /> GeoDesign, Inc. <br /> Q de wA <br /> Rya . Lawrence, P.E. (Oregon) c.4 <br /> Senior Project Engineer <br /> r.. <br /> 4 <br /> 26403 z <br /> '� 'rs�r'it\ <br /> Scott V. Mills, P.E. '51—V A1- <br /> Principal Engineer Signed 05/30/2017 <br /> cc: Nick Abdelnour, Polygon Northwest Company(via email only) <br /> Ron Bowen, Polygon Northwest Company(via email only) <br /> RTL:SVM:ds <br /> One copy submitted(via email only) <br /> Document ID:Polygon-128-03-053017-geol-compliance-Bldg-18.docx <br /> ©2017 GeoDesign,Inc. All rights reserved. <br /> MINDESIGNV <br /> C2/..D/ Polygon-128-03:053017 <br />