My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 WETMORE AVE CANYON CREEK CHURCH 2019-06-25
>
Address Records
>
WETMORE AVE
>
2201
>
CANYON CREEK CHURCH
>
2201 WETMORE AVE CANYON CREEK CHURCH 2019-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 1:25:58 PM
Creation date
6/25/2019 1:25:56 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2201
Tenant Name
CANYON CREEK CHURCH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> March 31, 2018 <br /> Shawn Pederson <br /> SGP Remodel LLC <br /> 1027 Lombard Avenue <br /> Everett, WA 98201 <br /> SGPRemodelOgmail.com <br /> Owner: Canyon Creek Church <br /> Job Address: 2201 Wetmore Avenue <br /> Plan Check No: B1803-010 <br /> RE: Building Permit Review Letter <br /> Dear Mr. Pederson, <br /> In response to the application for a building permit, the plans have been examined and you are <br /> advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. <br /> General <br /> 1. The building underwent a tenant improvement (under permit C0604-002) in 2008, which <br /> was never completed and has since expired. There have been no building permits for the <br /> building since. As part of that plan submission, drawings were provided showing the <br /> condition of the existing toilet rooms, which differ substantially from the drawings for the <br /> existing building that have been submitted currently for permit. Under the previously <br /> expired permit, no work(plumbing, mechanical or building)to revise the toilet rooms was <br /> inspected or approved. The condition of the existing toilet rooms is therefore Unlawful <br /> and must be revised. Sections 105.1 & 114.1 <br /> a. The following comments apply to the two toilet rooms in the basement: <br /> i. The rooms are required to be fully accessible to the current standards of <br /> the codes. Revised drawings should be provided that show clearances, grab <br /> bars, mounting heights, etc. Section 1109.2 <br /> b. The plumbing for the current toilet-room fixtures has not been inspected or <br /> approved. A permit is required for the new fixtures, inspection will commence at <br /> rough-in. Sections 105.1 & 110.6 <br /> c. Exhaust fans should be shown in the toilet rooms and vented to the exterior. IMC <br /> Section 403.3.1.2 <br /> 2. The raised platform is higher than 7" above the finished floor below. A step should be <br /> shown (minimum of 11" in run) to access the platform. Section 1011.5.2 <br /> 3. The stairs to the platform should be provided with handrails on each side. Section 1011.11 <br /> /73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.