Laserfiche WebLink
5/16/2019 Page � <br /> City of Everett / <br /> 11:00:32AM .- <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1609-021 Site Address 2802 WETMORE AVE <br /> Applied 9/20/2016 Applicant TAYLOR AL Lot <br /> Approved 10/10/2016 Owner BRODERICK GROUP Block <br /> Issued 10/11/2016 Contractor HANSEN CONSTRUCTION INC Tract <br /> Parent Permit No. B1610-006 Description RECONFIGURE INTERIOR AFTER DEMO-FUNKO <br /> Notes INTERIOR WORK ONLY FOR PERMIT;NOT TO INCLUDE ANY EXTERIOR MODIFICATIONS. <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 11/10/2016 8/17/2017 Consultation DWF Approval See notes Stairs-handrailing(existing) <br /> Slide installed in new stairway?plans? <br /> 11/30/2016 11/30/2016 Framing DWF PartialApproval See notes Basement floor OK to cover walls. <br /> Harry Potter-1st floor area <br /> Framing OK to one side. <br /> 12/14/2016 12/14/2016 Framing DWF PartialApproval See notes Partial approval-divider wall(movie <br /> theater area). <br /> Need Arch/Engineer seismic design for <br /> bracing wall. <br /> Note: 18 gauge studs 16"on center <br /> installed. <br /> Rest of movie theater are OK to cover. <br /> 12/28/2016 12/28/2016 BLDG DWF APPROVAL 5th floor walls only, OK to cover(insulation/drywall) <br /> 08-FRAMING see notes <br /> 1/11/2017 1/11/2017 BLDG DWF PARTIAL APPR 4th floor framing OK walls only <br /> 08-FRAMING 3rd floor <br /> OK to cover <br /> 1/13/2017 1/13/2017 BLDG 12-CEILING DWF PARTIAL APPR Hard lid next to elevators.OK to cover- <br /> GRID drywall. <br /> 1/25/2017 1/25/2017 BLDG DWF PARTIAL APPR Basement level-framing <br /> 08-FRAMING Partial approval-subject to electrical rough <br /> in sign off <br /> 2/1/2017 2/1/2017 BLDG DWF PARTIAL APPR Floor#4 cut out,framing for smoke curtain <br /> 08-FRAMING wall,14"height. <br /> 2/7/2017 2/7/2017 BLDG DWF PARTIAL APPR 2nd floor-walls-OK to cover <br /> 08-FRAMING 3rd floor-14"fire/smoke curtain wall <br /> New stair/slide <br /> 2/22/2017 2/22/2017 BLDG DWF PARTIAL APPR 2nd floor-stairway opening framing <br /> 08-FRAMING -smoke curtain <br /> as per plans-Ok to cover. <br /> 2/28/2017 2/28/2017 BLDG DWF PARTIAL APPR 1st floor: <br /> 08-FRAMING NE Corner(display area) <br /> Elevator lobby area <br /> Jail cell area-install positive connect for <br /> seismic 2x10 before cover <br /> Castle area <br /> Subject to electircal rough in. <br /> 3/8/2017 3/8/2017 BLDG 12-CEILING DWF PARTIAL APPR Ceiling grid-5th floor only OK to tile. <br /> GRID Note:light fixture front of elevator- <br /> weight? <br /> Need for seismic wires. <br /> 3/21/2017 3/21/2017 BLDG 12-CEILING DWF PARTIAL APPR 4th floor OK to tile <br /> GRID <br /> 3/27/2017 3/27/2017 BLDG DWF CORRECTION 1st floor(bat cave)ceiling-need arch/eng <br /> 08-FRAMING for beams/post design-seismic. <br /> 3/30/2017 3/30/2017 BLDG DWF PARTIAL APPR (2/20/2019 9:57 AM KLC) <br /> 08-FRAMING Bat cave area- <br /> Subject to receiving letter from <br /> architect/engineer of record for framing <br /> celing-post-beam connections for seismic. <br /> 4/12/2017 4/12/2017 Final Fire DWF Approval Ok to occupy floors <br /> 4&5 <br /> INSP12 CRWS I' m M <br />