My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2802 WETMORE AVE FUNKO 2019-06-25
>
Address Records
>
WETMORE AVE
>
2802
>
FUNKO
>
2802 WETMORE AVE FUNKO 2019-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 4:07:54 PM
Creation date
6/25/2019 4:07:07 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2802
Tenant Name
FUNKO
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/16/2019 Page 2, <br /> City of Everett /'� <br /> 11:00:32AM <br /> INSPECTION ACTIVITY REPORT <br /> 4/12/2017 4/12/2017 Final Bldg DWF OTHER OK for TCO,see 5th floor,OK to occupy <br /> notes <br /> 4/13/2017 4/13/2017 Final Bldg DWF APPROVAL OK to TCO,see 4th floor only OK to occupy. <br /> notes Note:Riser opening heights under 4" <br /> stairway bottom tread. <br /> Also on 5th floor. <br /> 4/20/2017 4/20/2017 Grid,Bldg DWF Approval 3rd floor OK to <br /> cover <br /> 5/9/2017 5/9/2017 Final Bldg DWF PartialApproval OK to TCO Maintain barricades at stairway until <br /> permanent guard railing is installed. <br /> Deadline for TCO is Wednesday 5/31/17 <br /> Note: Bottom riser height max under 4"as <br /> per IBC. <br /> 5/22/2017 5/22/2017 Grid,Bldg DWF Corr Reqd Complete seismic wires to all light pods. <br /> 2x4 type <br /> 2x2 type <br /> 5/23/2017 5/23/2017 Grid,Bldg DWF Approval 2nd floor ceiling grid <br /> OK to cover(tile) <br /> 6/20/2017 6/20/2017 Final Bldg DWF PartialApproval Basement and 2nd floor OK for TCO. <br /> Ok to occupy. <br /> Deadline 7/12/17. <br /> 6/21/2017 6/21/2017 Grid,Bldg DWF Approval Ceiling grid only,Marriotts place <br /> Approved to cover(ceiling tile) <br /> 7/10/2017 7/10/2017 TCO Issued TRL Approval see notes Applies to basement and floors 2,3,4&5 <br /> ' (07/10/2017 9:26 AM TKJ) <br /> OK for TCO <br /> 7/12/2017 7/12/2017 Grid,Bldg DWF PtAppr-CorrReq Entry area only 1st floor-OK for tile <br /> 8/7/2017 8/7/2017 Grid,Bldg DWF Approval Ceiling grid-1st floor <br /> Reception rooms(next to elevator)only <br /> OK <br /> 8/17/2017 8/17/2017 Consultation DWF Other Need electrical TCO <br /> 8/18/2017 8/18/2017 Bldg Other DWF Other OK for temporary <br /> CO,expires 1/1/18 <br /> 4/20/2018 4/20/2018 ADMIN OTHER TAH APPROVAL EXTENTION FOR <br /> TCO,expires <br /> 6/30/18 <br /> 11/27/2018 11/27/2018 FIRE 05-FINAL CHA APPROVAL <br /> 2/27/2019 2/27/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 2/27/2019 2/27/2019 BLDG 15-FINAL DWF APPROVAL (2/27/2019 2:06 PM DWF) <br /> Building final-CO <br /> 3/13/2019 5/16/2019 CERTIFICATE OF TKJ APPROVAL (3/13/2019 9:56 AM TJJ) <br /> OCCUPANCY Planning inspection required as noted on <br /> S1705-004.Steve Ingalsbe is going to do <br /> planning final. <br /> (5/16/2019 10:30 AM TJJ) <br /> Per phone conversation with Steve Ingaslbe <br /> today,Ok to issue C of. <br /> INSP12 =Ws YS TEM S <br />
The URL can be used to link to this page
Your browser does not support the video tag.