Laserfiche WebLink
I <br /> ATTACHMENT 6 <br /> I <br /> ADDENDUM NO. 1 <br /> RESPONSE TO PRE-BID QUESTIONS <br /> removed at control or expansion joints and full sections replaced,asphalt may be saw cut, I patched as needed for all new work. <br /> 9. Q: Irrigation heads and valves? <br /> I <br /> a. Parks staff will remove what they want to salvage,all over heads/valves/equipment shall <br /> be removed and disposed of offsite.Mainline shall be capped,all laterals within the fields <br /> I <br /> can stay and be removed as found if needed during the renovation of the fields. <br /> 10. Q: What about existing bleachers? <br /> I <br /> a. (Erik, I changed my mind.) Contractor shall be responsible to relocate bleachers, if <br /> necessary for construction,and reinstall at same location. <br /> I <br /> 11. Q: Substitution requests who do they go to? <br /> a. All substitution requests shall be sent to City for review. See the forms within the <br /> I <br /> documents. <br /> I <br /> END OF RESPONSE TO PRE-BID QUESTIONS. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Addendum No. 1 —Response to Pre-Bid <br /> I <br /> Page 2 <br />