My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc 6/25/2019
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 6/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:47 AM
Creation date
6/28/2019 10:08:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
6/25/2019
Council Approval Date
5/15/2019
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Phil Johnson Ballfields Renovation
Tracking Number
0001860
Total Compensation
$3,847,270.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 6/21/2021 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 9/28/2020 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I Phil Johnson Ballfields 26.55.68 <br /> City of Everett Parks&Community Services ATHLETIC FIELD LIGHITING <br /> 1 SECTION 26 55.68 <br /> ATHLETIC FIELD LIGHITNG <br /> I <br /> PART 1 -GENERAL <br /> 1 1.01 RELATED DOCUMENTS <br /> Drawings and general provisions of the bid documents, including general and supplementary conditions <br /> Iapply to this section. <br /> 1.02 DESCRIPTION OF WORK <br /> IA. Bid Alternate D—Lighting Upgrade <br /> I The project includes the replacement of existing sports field lighting luminaires with <br /> new LED luminaries and installation of remote controls via web based applications. <br /> Contractors are to remove the existing lighting,crossarms, and wiring harnesses. <br /> I Design, layout,and install new LED luminaires and accessories on existing poles. <br /> Contract includes all connections,testing,controls and cabinets as required to meet the <br /> design intent. <br /> IB. Bid Alternate E—Lighting System Replacement <br /> The project is to include new steel poles,foundations,web based controls and LED <br /> 11 fixtures by Musco Lighting or approved equal. <br /> C. The g <br /> Sports Lighting section includes: <br /> P g <br /> Ii. Galvanized steel luminaire mounting crossarms <br /> 2. Luminaire, with appropriate glare/spill light control <br /> 3. LED Lighting <br /> I 4. Alternate Bid E: Steel Poles and engineered foundations <br /> 5. Control System <br /> 6. Junction Boxes <br /> i7. Conduit and Wire <br /> D. The purpose of this specification is to define the performance standards, product values <br /> and features required manufacturer's service responsibilities,and design standards for the <br /> Ifield lighting renovation at Phil Johnson Ball Fields. <br /> 1.03 SUBMITTALS <br /> IA. It has been predetermined that these project specifications are the minimum acceptable <br /> criteria for this project. <br /> I <br /> Page 1 of 13 2/4/2019 <br /> I Job#2019-054 <br /> Div 26 <br /> IlL <br /> rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.