My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc 6/25/2019
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 6/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:47 AM
Creation date
6/28/2019 10:08:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
6/25/2019
Council Approval Date
5/15/2019
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Phil Johnson Ballfields Renovation
Tracking Number
0001860
Total Compensation
$3,847,270.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 6/21/2021 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 9/28/2020 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Phil Johnson Ballfields 26.55.68 <br /> City of Everett Parks&Community Services ATHLETIC FIELD LIGHITING <br /> 1 <br /> Area of Lighting Entire Area <br /> Soccer Fields 30.0 foot-candles <br /> Softball/Baseball infields 50.0 foot-candles <br /> Softball/Baseball Outfields 30.0 foot-candles <br /> 2. Uniformity Ratio: The foot-candle level shall have a uniformity ratio of <br /> maximum to minimum ratio of not greater than the following: <br /> Area of Lighting Entire Area <br /> Soccer Fields 3.0:1 <br /> Softball/Baseball infields 2.5:1 <br /> ' Softball/Baseball Outfields 3.0:1 <br /> 3. The manufacturer guarantees field light intensity levels and uniformity ratios at <br /> initial start-up and throughout entire duration of the warranty. Light level <br /> readings shall be completed as detailed in the point-by-point analysis <br /> specification. <br /> 1.05 POINT BY POINT ANALYSIS <br /> A. Submitted computer models shall depict the Measurements of light shall be demonstrated <br /> on a computer-generated model which consists of a grid of a specified number of points <br /> covering a stated area on an equally spaced grid. See the below chart for the exact <br /> specifications of points,areas,and grid spacing for each field. <br /> I <br /> I <br /> I <br /> I <br /> Page 3 of 13 2/4/2019 <br /> Job#2019-054 <br /> Div 26 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.