Laserfiche WebLink
1 <br /> Phil Johnson Ballfields 26.55.68 <br /> City of Everett Parks&Community Services ATHLETIC FIELD LIGHITING I <br /> B. The athletic field lighting poles shall be installed as per manufacturers approved final <br /> submittal layout(Bid Alternate E) <br /> C. All locations shall be surveyed into the field locations by a licensed land surveyor(Bid ' <br /> Alternate E) <br /> D. Structural footings shall be installed as per the approved structural plans and drilled into <br /> the project site. Submittal drilling plans and means and methods for approval(Bid <br /> Alternate E)All poles shall be set and verified for straight and plumb,with proper angles <br /> of cross arms and fixtures. (Bid Alternate E) <br /> E. After installation of poles/arms/fixtures the contractor shall align and aim all fixtures. <br /> Verify installation and aiming of fixtures by manufacturers representative on site. (Bid <br /> Alternate E) I <br /> F. Provide laminated and plastic labels on all controls,boxes,and cabinets. Provide all <br /> plastic markers/labels on red lines as builts. I <br /> 3.04 INSPECTION&TESTING <br /> Manufacturer shall test and inspect all final work and verify all field lighting meets stated and I <br /> contracted lighting levels. <br /> 3.05 CLEANING I <br /> Remove all extraneous debris,materials and equipment from the site within 24 hours of work <br /> completion,all recycle materials shall be disposed of properly off site in conjunction with the <br /> general contractor. <br /> 3.06 WARRANTY <br /> 3.07 LIFE CYCLE SAVINGS <br /> Energy Consumption: The kWh consumption for the entire field lighting system shall be 86.0 or <br /> less. <br /> 3.08 INSPECTION AND VERIFICATION <br /> The lighting manufacturer shall guarantee illumination light levels do not drop below the criteria <br /> detailed in section 1.04. Field measurements shall be done per IESNA RP-6-15 <br /> recommendations. Failure to achieve the required results will require individual fixture re-aiming <br /> and re-measurements at the expense of the manufacturer. <br /> 3.09 FIELD TECHNICIAN <br /> Manufacturer shall have available a local factory trained technician to provide project support <br /> including but not limited to: Luminaire replacement,confirm luminaire aiming points, <br /> troubleshoot, and educate customer maintenance personnel. <br /> Page 12 of 13 2/4/2019 <br /> Job#2019-054 <br /> Div 26 ' <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />