Laserfiche WebLink
I <br /> Phil Johnson Ballfields 33.46.16.19 <br /> City of Everett Parks& Community Services ATHLETIC FIELD DRAINAGE <br /> SECTION 33.46.16.19 <br /> ATHLETIC FIELD DRAINAGE <br /> PART 1 -GENERAL <br /> 1.01 GENERAL REQUIREMENTS <br /> A. Conform to the General Conditions, Supplementary Conditions,and Division 1. <br /> 1.02 DESCRIPTION OF WORK <br /> A. The location and extent of the Field Drainage work is indicated on the Drawings. The <br /> work includes the requirements for furnishing and installing extensions of existing field <br /> drains for the alternate bids,clean outs,renovation of all existing drainage on all four <br /> baseball/softball fields within the project areas. <br /> B. New sections of field lateral drainage will be installed(Alternate Bid),and all existing <br /> lateral drainage,as indicated on the drawings, shall be renovated. Existing drainage shall <br /> be exposed to the pipe,new aggregate to new established subgrade,and all existing <br /> structures cleaned and prepared for the installation of the permeable field base aggregate. <br /> ' The work includes all location,layout,materials,labor and equipment and associated <br /> small items required to complete the work as shown and intended in the plans and details. <br /> 1.03 RELATED SECTIONS <br /> A. Section-Permeable Base Aggregate <br /> B. Section—Rubberized Elastic Layer <br /> 1.04 RELATED DOCUMENTS(References and Standards) <br /> A. Standard Specifications for Road,Bridge and Municipal Construction,2016(WSDOT <br /> and APWA). <br /> 1.05 CONTRACTOR QUALIFICATIONREQUIREMENTS <br /> A. The contractor selected shall be a Sports field Specialty Contractor defined as: <br /> 1. Licensed with the state of WA for 10 years or more and have the following <br /> experience-Primarily responsible for the site work and/or installation of natural <br /> and synthetic turf athletic field projects similar to this project. <br /> ' 2. Requirements for Field Drainage Subcontractor. The Subcontractor listed in Part <br /> B of Section Proposed Subcontractors Form as the "Field Sub-Grade <br /> 1 Establishment"Subcontractor must satisfy both of the following requirements: <br /> a. For at least the five(5)years prior to Bid opening,the Field Sub-Grade <br /> Subcontractor must have been in the business of actively and directly <br /> constructing sub-grade portions of natural or synthetic field subgrades <br /> with its own forces. <br /> Page 1 of 6 2/4/2019 <br /> Job#2019-054 <br /> Div 33 <br /> 'Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />