Premier Field Development Inc 6/25/2019
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 6/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:47 AM
Creation date
6/28/2019 10:08:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
6/25/2019
Council Approval Date
5/15/2019
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Phil Johnson Ballfields Renovation
Tracking Number
0001860
Total Compensation
$3,847,270.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 6/21/2021 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 9/28/2020 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Phil Johnson Ballfields 33.46.16.19 <br /> City of Everett Parks&Community Services ATHLETIC FIELD DRAINAGE <br /> b. Within the three(3)years prior to Bid opening,the Field Sub-Grade <br /> Subcontractor must have successfully completed with its own forces the <br /> subgrade portion of at least five(5)sports field installations of 60,000 SF <br /> or larger. Three(3)of these five fields must be,major league sports <br /> (National Football League—NFL,Major League Soccer—MLS,Major <br /> League Baseball—MLB or college baseball/softball fields). <br /> c. If Bidder listed itself as the Field Subgrade Subcontractor,then Bidder <br /> itself must satisfy both of the above requirements with its own forces. <br /> 1.06 JOB CONDITIONS <br /> A. Conditions: Contractor shall inspect the site to determine the extent and conditions under <br /> which the work is to be done. <br /> B. These are existing fields with sod, irrigation, existing field drainage,synthetic turf infield <br /> areas, and clay infields. Contractor shall visit all sites to familiarize with access and for <br /> equipment access for drainage work. <br /> C. Execute all work in an orderly and careful manner with due consideration of surrounding111 <br /> areas. Periodically water as required to allay dust and dirt. Protect any adjacent property <br /> and improvements and all existing utilities from damage and replace any portions <br /> damaged through this operation at no additional cost to the Owner. <br /> D. Utilities: It shall be the Contractor's responsibility to avail himself of any information <br /> concerning existing utilities in this area in order to prevent damage to same. Any damage <br /> to utilities shall be the Contractor's full responsibility and shall be repaired or restored at <br /> no additional cost to the Owner. <br /> E. Should the existing utilities be encountered in the work,protect such utilities. I <br /> F. See site plans for existing water,sanitary,electrical and storm drainage utilities located <br /> on site surrounding the four fields and project site. As Built plans are available from the <br /> City of Everett Parks&Community Services upon request. 111 <br /> G. Contractor to have private locate completed prior to any earthwork and notify the <br /> Landscape Architect or Engineer of record of any discrepancy of the plans and existing <br /> utilities,specifically electrical lines,conduit that is existing and proposed sanitary,water <br /> and storm drainage lines. <br /> 1.07 SUBMITTALS <br /> A. All submittals shall be submitted to the General Contractor and Landscape Architect after <br /> "notice to proceed". <br /> B. All applicable warranties. <br /> C. 12"segment of locator tape. <br /> Page 2 of 6 2/4/2019 <br /> Job#2019-054 <br /> Div 33 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />