Laserfiche WebLink
i <br /> Phil Johnson Ballfields 33.46.16.19 <br /> City of Everett Parks& Community Services ATHLETIC FIELD DRAINAGE <br /> 4. Existing lateral drainline trenches that are to be renovated shall be located and <br /> then old materials removed from trenches, and new clear aggregate installed to <br /> the new subgrade elevations. <br /> 5. Contractor shall exercise extreme care to prevent contamination of drain trench 1 <br /> tubing and caving in or other damage to the edges of the drain trenches. Any <br /> damage or contamination that occurs shall be repaired at the Contractor's <br /> expense,to the satisfaction of the Landscape Architect. 1 <br /> 6. Prior to installing and new or replaced drain lines, place the required depth of pea <br /> gravel as shown on the Drawings. Set drain lines to true and accurate grades and <br /> fill trench with pea gravel to established subgrade. Contact Landscape Architect <br /> for inspection. <br /> 7. All drain line connections to catch basins and storm drain system shall be per <br /> WSDOT(2016)Specifications. <br /> D. CLEANUP <br /> 1. Remove all debris and unused materials and remove from site. <br /> END OF SECTION <br /> 111I <br /> 1 <br /> I <br /> 1 <br /> i <br /> 1 <br /> Page 6 of 6 2/4/2019 <br /> Job#2019-054 <br /> Div 33 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />