Laserfiche WebLink
Section 00 21 13 <br /> INSTRUCTIONS TO BIDDERS <br /> 2. Payment and Performance Bond: This form is to be executed by the successful Bidder and his <br /> surety company in triplicate. The amount of these bonds shall be 100 percent of the Total Bid <br /> Amount and shall be submitted with the Contract. <br /> ' 3. Proof of Insurance: Insurance certificates and endorsements shall be obtained and maintained <br /> in force in accordance with Section 007200, Part 15 "Liability and Insurance", of the Contract <br /> Documents. <br /> ' 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must file with each <br /> bond a certified and effectively dated copy of their Power of Attorney. <br /> 5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit of Wages <br /> Paid (F700-007-000)from the Contractor,Subcontractor and agents to the Subcontractor shall be <br /> submitted to the Employment Standards Division, State Department of Labor and Industries, <br /> Olympia, Washington. If the prime contract is over $1,000,000, then Contractor also needs to <br /> submit L&I Form F700-164-000(Affidavit of Wages Paid EHB 2805 Addendum). <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form WH347): <br /> Contractors, Subcontractors, and agents to Subcontractors using Payroll Form WH347) may use <br /> State of Compliance found on back of form. <br /> ' 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH 348). Contractors, <br /> Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall attach the <br /> Statement of Compliance Form WH 348 to each payroll. <br /> 8. Approval of Subcontractors: Contractors shall request approval of Subcontractors on a form <br /> provided by the City prior to their working on the Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Section 007200,Part 5"Progress <br /> and Completion",of the Contract Documents by the Contractor within ten calendar days,or such <br /> time as determined by the Landscape Architect, after the date of receipt of Notice to Proceed. <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City's Design and <br /> Construction Standards. If,and to the extent,such plans are not sufficient,complete or adequate <br /> to support the Bidder's planned means and methods of performing the Work, the Bidder must <br /> develop an adequate, complete and sufficient traffic control plan at its cost, that shall be <br /> submitted for the City's approval prior to construction. Deviation from the Standard Plans must <br /> be submitted by the Contractor and approved by the City prior to construction. <br /> 11. Disposal Sites: Provide the Landscape Architect with the location of all disposal sites to be used, <br /> and also provide copies of the permits and approvals for such disposal sites. The Contractor shall <br /> provide the Landscape Architect with copies of all permits for disposal and storage of surplus <br /> materials within ten calendar days after award of the Contract. <br /> 1.22 Postponement of Opening <br /> The City reserves the right to postpone the date and time for receiving or opening of Bids, or both, at <br /> any time prior to the date and time established in the Notice to Bidders. Postponement notices shall be <br /> provided to Bidders in the form of addenda. <br /> ' 1.23 Business License <br /> A City of Everett business license is required for the Contractor and Subcontractors performing Work on <br /> this Project. <br /> Phil Johnson Ballfields Renovation 11 of 12 <br /> I <br />