My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc 6/25/2019
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 6/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:47 AM
Creation date
6/28/2019 10:08:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
6/25/2019
Council Approval Date
5/15/2019
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Phil Johnson Ballfields Renovation
Tracking Number
0001860
Total Compensation
$3,847,270.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 6/21/2021 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 9/28/2020 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fifi&c7Z-1/C� Section 00 41 13 <br /> Bid Form <br /> ADD ALTERNATE: D <br /> E. LIGHTING1 � � . <br /> (REPLACE EXISTING FIELD LUMINAIRE O �, r $ <br /> _ �l r� CSG <br /> FIXTURES WITH LED FIXTURES) DOLLARS LENTS <br /> ADD ALTERNATE: E <br /> LIGHTING (REPLACE ALL POLES <br /> F. AND LUMINAIRE FIXTURES WITH LED ��O ����� S`)C $\z= � Ob <br /> FIXTURES AND STEEL POLES <br /> DOLLARS CENTS <br /> Bidder agrees that the base bid above does not include Washington State Sales Tax, local sales <br /> tax or county business and occupation tax. <br /> I <br /> 1. SALES TAX <br /> The above total amount of"Base Bid" and "Alternate Bids"(if any) do not include Washington <br /> State Sales Tax.The sales tax on taxable items will be added to the total contract price of the <br /> successful bidder. <br /> 2. OVERHEAD AND PROFIT <br /> "Base Bid" includes overhead, profit, performance and payment bonds, and all other expenses <br /> involved whatsoever. The amount for each alternate includes overhead, profit, performance and <br /> payment bonds,and all other expenses involved whatsoever for such alternate. <br /> 3. TIME FOR COMPLETION <br /> Undersigned hereby agrees to begin work immediately after receiving Owner's letter of Notice to <br /> Proceed and to reach Substantial Completion within the dates required under the Contract <br /> Documents. In the event the project is not completed on or before required time periods, Bidder ' <br /> shall pay liquidated damages to the City as stated in the Contract(Section 005213). <br /> 4. The undersigned, as Bidder, declares that it will contract with the Owner using the Contract form <br /> provided herewith, on the terms and conditions contained herein, to do everything necessary for <br /> construction of the project complete. <br /> 5. Undersigned agrees that the following shall form a part of this Bid: Bid Form and all supplemental <br /> submittals provided at the direction of the Owner or Owner's Representative. <br /> 6. Attached is a bid bond, by a guaranty company authorized to carry on business in the state of <br /> Washington,in the amount of five percent(5%)of the total amount of the"Base Bid"or,alternately, <br /> there is attached a certified or cashier's check payable to the City of Everett drawn upon a bank in <br /> the state of Washington, in the amount of five percent(5%) of the total amount of the "Base Bid". <br /> If this Proposal shall be accepted by the City of Everett, Washington, and the undersigned shall fail <br /> to execute a satisfactory contract and bond as stated in the Instructions to Bidders,hereto attached, <br /> Phil Johnson Ballfields Renovation 2 of 6 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.