My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • Compressive strength shall be 4000 psi or higher at 28 days in accordance with <br /> 2 AASHTO T 22 (ASTM C 39) for grout extended with coarse aggregate or <br /> 3 AASHTO T 106 (ASTM C109) otherwise. <br /> 4 <br /> 5 • Bond strength shall meet one of the following: <br /> 6 1 7 � 250 psi or higher at 28 days or less in accordance with ASTM 01583. <br /> 8 <br /> 9 2000 psi or higher at 28 days or less in accordance with ASTM C882. The <br /> 10 following modification to ASTM C882 is acceptable: use Type 3 Grout in lieu <br /> 11 of epoxy resin base bonding system and freshly mixed portland-cement <br /> 12 mortar in the procedure for testing Type II and V systems. <br /> 13 <br /> 14 • Drying shrinkage shall be 0.08 percent (800 microstrain) or lower at 28 days in <br /> 15 accordance with AASHTO T 160 (ASTM C157). The following modification to <br /> 16 AASHTO T 160 is acceptable: use a standard specimen size of 3 x 3 x 11-1/4 <br /> 17 inches. <br /> 18 <br /> 19 9-20.5 Bridge Deck Repair Material , <br /> 20 Item number 3 of the first paragraph is revised to read: <br /> 21 <br /> 22 3. Permeability of less than 2,000 coulombs at 28-days or more in accordance with <br /> 23 AASHTO T 277. <br /> 24 <br /> 25 Section 9-21, Raised Pavement Markers (RPM) <br /> 26 January 2, 2018 <br /> 27 9-21.2 Raised Pavement Markers Type 2 <br /> 28 This section's content is deleted. <br /> 29 <br /> 30 9-21.2(1) Physical Properties <br /> 31 This section, including title, is revised to read: <br /> 32 <br /> 33 9-21.2(1) Standard Raised Pavement Markers Type 2 <br /> 34 The marker housing shall contain reflective faces as shown in the Plans to reflect incident <br /> 35 light from either a single or opposite directions and meet the requirements of ASTM D 4280 <br /> 1 <br /> 36 including Flexural strength requirements. <br /> 37 <br /> 38 9-21.2(2) Optical Requirements <br /> 39 This section, including title, is revised to read: <br /> 40 <br /> 41 9-21.2(2) Abrasion Resistant Raised Markers Type 2 <br /> 42 Abrasion Resistant Raised Markers Type 2 shall comply with Section 9-21.2(1) and meet <br /> 43 the requirements of ASTM D 4280 with the following additional requirement: The coefficient <br /> 44 of luminous intensity of the markers shall be measured after subjecting the entire lens <br /> 45 surface to the test described in ASTM D 4280 Section 9.5 using a sand drop apparatus. <br /> 46 After the exposure described above, retroreflected values shall not be less than 0.5 times a <br /> 47 nominal unblemished sample. <br /> 1 <br /> 48 <br /> 49 9-21.2(3) Strength Requirements <br /> 50 This section is deleted in its entirety. <br /> City of Everett Page AM-102 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.