Laserfiche WebLink
I <br /> INSTRUCTIONS TO BIDDERS <br /> I <br /> 1.0 Design Engineer <br /> Questions and inquiries about these Contract Provisions should be directed to the attention of <br /> Tom Hood, P.E., (425) 257-8809; or Gina Parenteau, P.E., at Perteet Inc., (425) 252-7700. <br /> 2.0 Bid Schedules <br /> This project includes 5 bid schedules, which are incorporated into the Proposal. Bid schedules <br /> are defined as follows: <br /> Schedule A: Hoyt Avenue Street Improvements <br /> Schedule B: Hoyt Avenue Paving <br /> Schedule B 1: HMA Paving <br /> Schedule B2: Cement Concrete Paving <br /> Schedule C: Rucker Avenue Street Improvements <br /> Schedule D: Rucker Avenue Paving <br /> Schedule Dl: HMA Paving <br /> Schedule D2: Cement Concrete Paving <br /> Schedule E: Water Main and Appurtenances <br /> The project will include the total of Schedule A plus Schedule C plus Schedule E as the Base <br /> Bid. The Proposal also includes Schedule B, which includes alternates B] and B2 and Schedule <br /> D, which includes alternates D1 and D2. The City has not yet decided between alternates B1 and <br /> B2 under the Schedule B and between alternates D1 and D2 under Schedule D. This decision is <br /> at the City's sole discretion and will be made after Bid opening. <br /> If the City decides the project will include alternate B1 and D1, the project will be award to the <br /> lowest responsible Bidder based on the sum of: <br /> Base Bid (sum of Schedule A, Schedule C, and Schedule E) and alternate B1 and alternate D1 <br /> If the City decides the project will include alternate B1 and D2, the project will be award to the <br /> lowest responsible Bidder based on the sum of: <br /> Base Bid (sum of Schedule A, Schedule C, and Schedule E) and alternate B1 and alternate D2 <br /> If the City decides the project will include alternate B2 and D1, the project will be award to the <br /> lowest responsible Bidder based on the sum of: <br /> Base Bid (sum of Schedule A, Schedule C, and Schedule E) and alternate B2 and alternate D1 <br /> If the City decides the project will include alternate B2 and D2, the project will be award to the <br /> lowest responsible Bidder based on the sum of: <br /> Base Bid (sum of Schedule A, Schedule C, and Schedule E) and alternate B1 and alternate D1 <br /> All bids must be made upon the regular forms provided for this purpose and must be <br /> accompanied by a bid bond or certified check in an amount not less than five percent (5%) of the <br /> Bidder's Base Bid. <br /> I <br /> City of Everett Instructions to Bidders <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />