My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-02.5 Proposal Forms <br /> 2 The first sentence of the first paragraph is revised to read: <br /> 3 <br /> 4 At the request of a Bidder, the Contracting Agency will provide a physical Proposal Form <br /> 5 for any project on which the Bidder is eligible to Bid. <br /> 6 <br /> 7 1-02.6 Preparation of Proposal <br /> 8 Item number 1 of the second paragraph is revised to read: <br /> 9 <br /> 10 1. A unit price for each item (omitting digits more than two places to the right of the <br /> 11 decimal point), <br /> 12 <br /> 13 In the third sentence of the fourth paragraph, "WSDOT Form 422-031" is revised to read <br /> 14 "WSDOT Form 422-031U". <br /> 15 <br /> 16 The following new paragraph is inserted before the last paragraph: <br /> 17 <br /> 18 The Bidder shall submit with their Bid a completed Contractor Certification Wage Law <br /> 19 Compliance form (WSDOT Form 272-009). Failure to return this certification as part of the <br /> 20 Bid Proposal package will make this Bid Nonresponsive and ineligible for Award. A <br /> 21 Contractor Certification of Wage Law Compliance form is included in the Proposal Forms. <br /> 22 <br /> 23 <br /> 24 Section 1-03, Award and Execution of Contract <br /> 25 January 2, 2018 <br /> 26 1-03.3 Execution of Contract <br /> 27 The first paragraph is revised to read: <br /> 28 <br /> 29 Within 20 calendar days after the Award date, the successful Bidder shall return the signed <br /> 30 Contracting Agency-prepared Contract, an insurance certification as required by Section 1- <br /> 31 07.18, a satisfactory bond as required by law and Section 1-03.4, the Transfer of Coverage <br /> 32 form for the Construction Stormwater General Permit with sections I, III, and VIII completed I <br /> 33 when provided, and shall be registered as a contractor in the state of Washington. <br /> 34 <br /> 35 1-03.5 Failure to Execute Contract <br /> 36 The first sentence is revised to read: <br /> 37 <br /> 38 Failure to return the insurance certification and bond with the signed Contract as required in <br /> 39 Section 1-03.3, or failure to provide Disadvantaged, Minority or Women's Business 111 <br /> 40 Enterprise information if required in the Contract, or failure or refusal to sign the Contract, <br /> 41 or failure to register as a contractor in the state of Washington, or failure to return the <br /> 42 completed Transfer of Coverage for the Construction Stormwater General Permit to the <br /> 43 Contracting Agency when provided shall result in forfeiture of the proposal bond or deposit <br /> 44 of this Bidder. <br /> 45 <br /> 46 Section 1-05, Control of Work <br /> 47 August 6, 2018 <br /> 48 1-05.5 Vacant <br /> 49 This section, including title, is revised to read: <br /> 50 <br /> 1 <br /> City of Everett Page AM-2 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.