My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1. Determine the arithmetic mean, Xm, for compaction of the lot: I <br /> 2 <br /> 3 X,,, = >X <br /> n <br /> 4 <br /> 5 Where: <br /> 6 x = individual compaction test values for each sublot in the lot. <br /> 7 Zx = summation of individual compaction test values <br /> 8 n = total number test values <br /> 9 <br /> 10 2. Compute the sample standard deviation, "S", for each constituent: <br /> 11 <br /> 2 ' z <br /> nLx —(Lx) <br /> 12 S = <br /> n(n-1) I <br /> 13 <br /> 14 Where: <br /> 15 Zx2= summation of the squares of individual compaction test values <br /> 16 (Zx)2 = summation of the individual compaction test values squared <br /> 17 <br /> 18 3. Compute the lower quality index (QL): <br /> 19 <br /> 20 X —LSL <br /> L S <br /> 21 <br /> 22 Where: <br /> 23 LSL = 92.0 1 <br /> 24 <br /> 25 4. Determine PL (the percent within the lower Specification limit which corresponds to <br /> 26 a given QL) from Table 1. For negative values of QL, PL is equal to 100 minus the <br /> 27 table PL. If the value of QL does not correspond exactly to a figure in the table, use <br /> 28 the next higher value. <br /> 29 <br /> 30 5. Determine the quality level (the total percent within Specification limits): <br /> 31 <br /> 32 Quality Level = PL <br /> 33 <br /> 34 6. Using the quality level from step 5, determine the composite pay factor (CPF) from <br /> 35 Table 2. <br /> 36I <br /> 37 7. If the CPF determined from step 6 is 1.00 or greater: use that CPF for the <br /> 38 compaction lot; however, the maximum HMA compaction CPF using an LSL = <br /> 39 92.0 shall be 1.05. 111 <br /> 40 <br /> 41 8. If the CPF from step 6 is not 1.00 or greater: repeat steps 3 through 6 using an <br /> 42 LSL = 91.5. The value thus determined shall be the HMA compaction CPF for that <br /> 43 lot; however, the maximum HMA compaction CPF using an LSL = 91.5 shall be <br /> 44 1.00. <br /> 45 <br /> I <br /> City of Everett Page AM-4 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.