My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 1-07.5(3) State Department of Ecology <br /> 2 This section is revised to read: <br /> 3 <br /> 4 In doing the Work, the Contractor shall: <br /> 5 <br /> 6 1. Comply with Washington State Water Quality Standards. <br /> 111 7 <br /> 8 2. Perform Work in such a manner that all materials and substances not specifically <br /> 9 identified in the Contract documents to be placed in the water do not enter waters <br /> I10 of the State, including wetlands. These include, but are not limited to, petroleum <br /> 11 products, hydraulic fluid, fresh concrete, concrete wastewater, process <br /> 12 wastewater, slurry materials and waste from shaft drilling, sediments, sediment- <br /> !! 13 laden water, chemicals, paint, solvents, or other toxic or deleterious materials. <br /> 14 <br /> 15 3. Use equipment that is free of external petroleum-based products. <br /> 16 <br /> 17 4. Remove accumulations of soil and debris from drive mechanisms (wheels, tracks, <br /> 18 tires) and undercarriage of equipment prior to using equipment below the ordinary <br /> I19 high water line. <br /> 20 <br /> 21 5. Clean loose dirt and debris from all materials placed below the ordinary high water <br /> 22 line. No materials shall be placed below the ordinary high water line without the <br /> I23 Engineer's concurrence. <br /> 24 <br /> 25 6. When a violation of the Construction Stormwater General Permit (CSWGP) <br /> I26 occurs, immediately notify the Engineer and fill out WSDOT Form 422-011, <br /> 27 Contractor ECAP Report, and submit the form to the Engineer within 48 hours of <br /> 28 the violation. <br /> I29 <br /> 30 7. Once Physical Completion has been given, prepare a Notice of Termination <br /> 31 (Ecology Form ECY 020-87) and submit the Notice of Termination electronically to <br /> in 32 the Engineer in a PDF format a minimum of 7 calendar days prior to submitting <br /> 33 the Notice of Termination to Ecology. <br /> 34 <br /> I35 8. Transfer the CSWGP coverage to the Contracting Agency when Physical <br /> 36 Completion has been given and the Engineer has determined that the project site <br /> 37 is not stabilized from erosion. <br /> 38 <br /> I39 9. Submit copies of all correspondence with Ecology electronically to the Engineer in <br /> 40 a PDF format within four calendar days. <br /> 41 <br /> I42 1-07.5(4) Air Quality <br /> 43 This section is revised to read: <br /> 44 <br /> I45 The Contractor shall comply with all regional clean air authority and/or State Department of <br /> 46 Ecology rules and regulations. <br /> 47 <br /> I48 The air quality permit process may include additional State Environment Policy Act (SEPA) <br /> 49 requirements. Contractors shall contact the appropriate regional air pollution control <br /> 50 authority well in advance of beginning Work. <br /> 1 51 <br /> City of Everett Page AM-7 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.