Laserfiche WebLink
I <br /> I1 d. Unwelcome, unwanted, rude or offensive conduct or advances of a sexual nature <br /> 2 which interferes with a person's ability to perform their job or creates an <br /> 3 intimidating, hostile, or offensive work environment. <br /> 4 <br /> 5 e. Language or conduct that is offensive, threatening, intimidating or hostile based <br /> 6 on race, gender, or sexual orientation. <br /> I7 <br /> 8 f. Repeating rumors about individuals in the Work Site that are considered to be <br /> 9 harassing or harmful to the individual's reputation. <br /> 1 10 <br /> 11 1-07.11(5) Sanctions <br /> 12 This section is supplemented with the following: <br /> I <br /> 13 <br /> 14 Immediately upon the Engineer's request, the Contractor shall remove from the Work site <br /> 15 any employee engaging in behaviors that promote harassment, humiliation, fear or <br /> 16 intimidation including but not limited to those described in these specifications. <br /> 17 <br /> 18 1-07.11(6) Incorporation of Provisions <br /> I19 The first sentence is revised to read: <br /> 20 <br /> 21 The Contractor shall include the provisions of Section 1-07.11(2) Contractual Requirements <br /> I22 (1) through (5) and the Section 1-07.11(5) Sanctions in every subcontract including <br /> 23 procurement of materials and leases of equipment. <br /> 24 <br /> I25 1-07.15(1) Spill Prevention, Control, and Countermeasures Plan <br /> 26 The last sentence of the first paragraph is revised to read: <br /> 27 <br /> 28 An SPCC Plan template and guidance information is available at <br /> I29 http://www.wsdot.wa.gov/environment/technical/disciplines/hazardous-materials/spill- <br /> 30 prevent-report. <br /> 31 <br /> I32 1-07.18 Public Liability and Property Damage Insurance <br /> 33 Item number 1 is supplemented with the following new sentence: <br /> 34 <br /> 1 35 This policy shall be kept in force from the execution date of the Contract until the Physical <br /> • 36 Completion Date. <br /> 37 <br /> I38 Section 1-08, Prosecution and Progress <br /> 39 January 7, 2019 <br /> 40 1-08.1 Subcontracting <br /> 41 The first sentence of the seventh paragraph is revised to read: <br /> 42 <br /> I43 All Work that is not performed by the Contractor will be considered as subcontracting <br /> 44 except: (1) purchase of Sand, ggrave! crushed stone, crushed slag, batched concrete <br /> 45 aggregates, ready-mix concrete, off-site fabricated structural steel, other off-site fabricated <br /> 46 items, and any other materials supplied by established and recognized commercial plants; <br /> I47 or (2) delivery of these materials to the Work site in vehicles owned or operated by such <br /> 48 plants or by recognized independent or commercial hauling companies hired by those <br /> 49 commercial plants. <br /> City of Everett Page AM-9 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />