Laserfiche WebLink
I <br /> 1 The following new paragraph is inserted after the seventh paragraph: <br /> 2 <br /> 3 The Contractor shall not use businesses (material suppliers, vendors, subcontractors, etc.) <br /> 4 with federal purchasing exclusions. Businesses with exclusions are identified using the • <br /> 5 System for Award Management web page at www.SAM.gov. <br /> 6 <br /> 7 1-08.5 Time for Completion <br /> 8 Item number 2 of the sixth paragraph is supplemented with the following: <br /> 9 <br /> 10 f. A copy of the Notice of Termination sent to the Washington State Department of <br /> 11 Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the <br /> 12 Notice of Termination by Ecology; and no rejection of the Notice of Termination by <br /> 13 Ecology. This requirement will not apply if the Construction Stormwater General <br /> 14 Permit is transferred back to the Contracting Agency in accordance with Section 8- <br /> 15 01.3(16). <br /> 16 <br /> 17 1-08.7 Maintenance During Suspension <br /> 18 The fifth paragraph is revised to read: <br /> 19 <br /> 20 The Contractor shall protect and maintain all other Work in areas not used by traffic. All <br /> 21 costs associated with protecting and maintaining such Work shall be the responsibility of <br /> 22 the Contractor. <br /> 23 <br /> 24 Section 1-09, Measurement and Payment <br /> 25 August 6, 2018 <br /> 26 1-09.2(1) General Requirements for Weighing Equipment <br /> 27 The last paragraph is supplemented with the following: <br /> 28 <br /> 29 When requested by the Engineer, the Contractor's representative shall collect the tickets <br /> 30 throughout the day and provide them to the Engineer's designated receiver, not later than <br /> 31 the end of shift, for reconciliation. Tickets for loads not verified as delivered will receive no <br /> 32 pay. <br /> 33 <br /> 34 1-09.2(2) Specific Requirements for Batching Scales <br /> 35 The last sentence of the first paragraph is revised to read: I <br /> 36 <br /> 37 Batching scales used for concrete or hot mix asphalt shall not be used for batching <br /> 38 other materials. <br /> 39 <br /> 40 1-09.10 Payment for Surplus Processed Materials <br /> 41 The following sentence is inserted after the first sentence of the second paragraph: <br /> 42 <br /> 43 For Hot Mix Asphalt, the Plan quantity and quantity used will be adjusted for the quantity of <br /> 44 Asphalt and quantity of RAP or other materials incorporated into the mix. <br /> 45 <br /> 46 Section 2-02, Removal of Structures and Obstructions <br /> 47 April 2, 2018 <br /> 48 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> 49 In item number 3 of the first paragraph, the second sentence is revised to read: <br /> 50 <br /> 1 <br /> City of Everett Page AM-10 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />