My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.1 <br /> BASIC BID SCHEDULE C ITEMS (Rucker Avenue Street Improvements) <br /> IITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL AMOUNT <br /> NO. QUANTITY (Figures) (Figures) <br /> At <br /> I C11 1 Project Temporary Traffic Control <br /> Lump Sum <br /> IPer Lump Sum <br /> At <br /> I C12 1 Clearing and Grubbing <br /> Lump Sum <br /> Per Lump Sum <br /> At <br /> I C13 1,561 Saw Cutting <br /> Linear Feet <br /> I <br /> Per Linear Foot <br /> At <br /> I C14 1 Removal of Structures and <br /> Lump Sum Obstructions <br /> Per Lump Sum i <br /> 1 At <br /> C15 14 Removing Extruded Curb <br /> Linear Feet <br /> IPer Linear Foot <br /> At <br /> I C16 289 Removing Asphalt Conc. Pavement <br /> Square Yards <br /> Per Square Yard <br /> I At <br /> C17 190 Gravel Borrow Incl.Haul <br /> I Tons <br /> Per Ton <br /> At <br /> I <br /> C18 1,540 Roadway Excavation Incl. Haul <br /> Cubic Yards <br /> IPer Cubic Yard <br /> At <br /> C19 7,731 Shoring or Extra Excavation Cl. B <br /> I Square Feet <br /> Per Square Foot <br /> At <br /> I C20 1 Trimming and Cleanup <br /> Lump Sum <br /> IPer Lump Sum <br /> City of Everett Page 16 Bid Proposal <br /> I <br /> Everett Downtown Streetscape Improvement April 12, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.