Laserfiche WebLink
.' <br /> ALTERNATE BID SCHEDULE D1 ITEMS (Rucker Avenue—HMA Paving) <br /> IITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL AMOUNT <br /> NO. QUANTITY (Figures) (Figures) <br /> At <br /> I D1-1 l Surveying <br /> Lump Sum _• <br /> I <br /> Per Lump Sum <br /> At <br /> I D1-2 1 Mobilization <br /> Lump Sum <br /> Per Lump Sum <br /> I At <br /> D1-3 1,080 Gravel Borrow Incl. Haul <br /> I Tons <br /> Per Ton <br /> At <br /> I <br /> D1-4 10,590 Roadway Excavation Incl.Haul <br /> Cubic Yards <br /> Per Cubic Yard <br /> I <br /> At <br /> D1-5 97 Crushed Surfacing Top Course <br /> I Tons <br /> Per Ton <br /> At <br /> I D1-6 4,694 Crushed Surfacing Base Course <br /> Tons <br /> IPer Ton <br /> At <br /> I <br /> D1-7 8,629 HMA Cl. '4 In.PG 58H-22 <br /> Tons . <br /> Per Ton <br /> IAt <br /> D1-8 912 Cement Conc. Curb Type E-1 <br /> I Linear Feet <br /> Per Linear Foot <br /> At <br /> I D1-9 3,673 Cement Conc. Curb and Gutter Type <br /> Linear Feet A-1 <br /> Per Linear Foot <br /> I <br /> City of Everett Page 27 Bid Proposal <br /> IEverett Downtown Streetscape Improvement April 12, 2019 <br />