My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IPlacement Tolerances <br /> Dowel Bars Tie Bars <br /> I Vertical: Center of Bar to Center of Slab Depth ± 1.00 inch max ± 1.00 inch max <br /> Dowel Bar Centered Over the Transverse Joint ± 1.00 inch max N/A <br /> Tie Bar Centered Over the Longitudinal Joint N/A ± 1.00 inch max <br /> I Parallel to Centerline Over the Length of the ±0.50 inch max N/A <br /> Dowel Bar <br /> Perpendicular to Longitudinal Joint Over the N/A ± 1.00 inch max <br /> I Length of the Tie Bar <br /> Parallel to Roadway Surface Over the Length of ±0.50 inch max ± 1.00 inch max <br /> the Bar <br /> 1 <br /> 2 Dowel bars and tie bars shall be placed according to the Standard Plan when multiple <br /> 3 panels are placed. Panels shall be cast separately from the bridge approach slab. <br /> 4 <br /> 5 Dowel bars to be drilled into existing concrete or at a new transverse contraction joint shall <br /> 6 have a parting compound, such as curing compound, grease, or other Engineer accepted <br /> 7 equal, applied to them prior to placement. <br /> I8 <br /> 9 Clean the drilled holes in accordance with the epoxy or grout manufacturer's instructions. <br /> 10 Holes shall be clean and dry at the time of placing the epoxy, or grout and tie bars. <br /> II 11 ' Completely fill the void between the tie bar and the outer limits of the drilled hole with epoxy <br /> II 12 or grout. Use retention rings to prevent leakage of the epoxy or grout and support the tie <br /> 13 bar to prevent movement until the epoxy or grout has cured the minimum time <br /> I14 recommended by the manufacturer. <br /> 15 <br /> 16 5-01.3(4)D Foundation Preparation <br /> 17 The Contractor shall smooth the surfacing below the removed panel and compact it to the <br /> I18 satisfaction of the Engineer. Crushed surfacing base course, or hot mix asphalt may be <br /> 19 needed to bring the surfacing to grade prior to placing the new concrete. <br /> 20 <br /> I21 If the material under the removed panel is uncompactable and the Engineer requires it, the <br /> 22 Contractor shall excavate the Subgrade 2 feet, place a soil stabilization construction <br /> 23 geotextile meeting the requirements of Section 9-33, and backfill with crushed surfacing <br /> I24 base course. This Work may include: <br /> 25 <br /> 26 1. Furnishing and hauling crushed surfacing base course to the project site. <br /> I27 <br /> 28 2. Excavating uncompactable material. <br /> 29 <br /> I30 3. Furnishing and placing a soil stabilization construction geotextile. <br /> 31 <br /> 32 4. Backfilling and compacting crushed surfacing base course. <br /> 33 <br /> I34 5. Removing, hauling and restocking any unused crushed surfacing base course. <br /> 35 <br /> 36 5--01.3(4)E Concrete Finishing <br /> I37 Grade control shall be the responsibility of the Contractor. <br /> 38 <br /> 39 All panels shall be struck off level with the adjacent panels and floated to a smooth surface. <br /> I <br /> City of Everett Page AM-13 Amendments <br /> IEverett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.