My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Repair areas shall be re-profiled to ensure they no longer require corrective Work. With <br /> 2 concurrence of the Engineer, a 10-foot straight edge may be used in place of the inertial <br /> 3 profiler. <br /> 4 . <br /> 5 If correction of the roadway as listed above either will not or does not produce satisfactory <br /> 6 results as to smoothness or serviceability the Engineer may accept the completed <br /> 7 pavement and a credit will be calculated in accordance with Section 5-01.5. Under these <br /> 8 circumstances, the decision whether to accept the completed pavement or to require <br /> 9 corrective work as described above shall be vested entirely in the Engineer. <br /> I10 <br /> 11 5-01.5 Payment <br /> 12 This section is supplemented with the following: <br /> I13 <br /> 14 "Grinding Smoothness Compliance Adjustment", by calculation. <br /> 15 Grinding Smoothness Compliance Adjustments will be based on the requirements in <br /> I 16 Section 5-01.3(10) and the following calculations: <br /> III 17 <br /> 18 A smoothness compliance adjustment will be calculated in the sum of minus $100 for <br /> I19 each and every section of single traffic lane 0.01 mile in length and $1,000 for each <br /> 20 and every section of single traffic lane 0.10 mile in length that does not meet the <br /> 21 requirements in Section 5-01.3(10) after corrective Work. <br /> 22 <br /> I23 Section 5-04, Hot Mix Asphalt <br /> 24 January 7, 2019 <br /> I25 5-04.1 Description <br /> 26 The last sentence of the first paragraph is revised to read: <br /> 27 <br /> 28 The manufacture of HMA may include additives or processes that reduce the optimum <br /> I29 mixing temperature (Warm Mix Asphalt) or serve as a compaction aid in accordance with <br /> 30 these Specifications. <br /> 31 <br /> I32 5-04.2 Materials <br /> 33 The reference to "Warm Mix Asphalt Additive" is revised to read "HMA Additive". <br /> 34 <br /> I35 5-04.2(1) How to Get an HMA Mix Design on the QPL <br /> 36 The last bullet in the first paragraph is revised to read: <br /> 37 <br /> I38 • Do not include HMA additives that reduce the optimum mixing temperature or serve as <br /> 39 a compaction aid when developing a mix design or submitting a mix design for QPL <br /> 40 evaluation. The use of HMA additives is not part of the process for obtaining approval <br /> I41 for listing a mix design on the QPL. Refer to Section 5-04.2(2)B. <br /> 42 <br /> 43 In the table, "WSDOT Standard Practice QC-8" is revised to read "WSDOT Standard Practice <br /> 44 QC-8 located in the WSDOT Materials Manual M 46-01". <br /> I45 <br /> 46 5-04.2(1)C Mix Design Resubmittal for QPL Approval <br /> 47 Item number 3 of the first paragraph is revised to read: <br /> I48 <br /> 49 3. Changes in modifiers used in the asphalt binder. <br /> 50 <br /> City of Everett Page AM-17 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.