I <br /> Table 3 1 <br /> Areas Excluded from MRI Acceptance Requirements <br /> Location Exclude <br /> Beginning and end of grinding Pavement within 0.02 mile <br /> The bridge and approach slab and <br /> Bridges and approach slabs 0.02 mile from the ends of the <br /> bridge or approach slab <br /> Defects in the existing roadway <br /> identified by the Contractor that 0.01-mile section containing the <br /> adversely affect the MRI such as defect and the 0.01-mile section <br /> dips, depressions and wheel path following the section with the defect. <br /> longitudinal joints.' <br /> 1The presence of defects is subject to verification by the Engineer <br /> 1 <br /> 2 Report the MRI results in inches per mile for each 0.01-mile section and each 0.10-mile <br /> 3 section. Do not truncate 0.10-mile sections for areas excluded from MRI acceptance <br /> 4 requirements. MRI requirements will not apply to 0.10-mile sections with more than three <br /> 5 0.01 mile-sections excluded. MRI requirements for the individual 0.01-mile sections shall <br /> 6 still apply. The Engineer will verify the analysis. <br /> 7 111 <br /> 8 The MRI for each 0.10 mile of ground lane will comply with the following: <br /> 9 <br /> Control Profile MRI per 0.10 Mile 1 Maximum MRI of Acceptance <br /> i Profile per 0.10 Mile <br /> 5_130 inches/mile 1 78 inches/mile <br /> >130 inches/mile 0.6 x Control Profile MRI <br /> 10 <br /> 11 The MRI for each 0.01 mile of the completed cement concrete grinding shall not exceed <br /> 12 160 inches/mile. <br /> 13 <br /> 14 All Work is subject to parallel and transverse 10-foot straightedge requirements, corrective <br /> 15 work and disincentive adjustments. <br /> 16 111 <br /> 17 Surface smoothness of travel lanes including areas subject to MRI testing shall not vary <br /> 18 more than 1/8 inch from the lower edge of a 10-foot straightedge placed on the surface <br /> Il <br /> 19 parallel to the centerline. <br /> 20 <br /> 21 The smoothness perpendicular to the centerline will be measured with a 10-foot <br /> 22 straightedge within the lanes. There shall be not vertical elevation difference of more than a 111 <br /> 23 'A inch between lanes. <br /> 24 <br /> 25 Pavement that does not meet these requirements will be subject to corrective Work. All <br /> 26 corrective Work shall be completed at no additional expense, including traffic control, to the <br /> 27 Contracting Agency. Pavement shall be repaired by one or more of the following methods: <br /> 28 I <br /> 29 1. Diamond grinding. <br /> 30 <br /> 31 2. By other method accepted by the Engineer. I <br /> 32 <br /> 111 <br /> City of Everett Page AM-16 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 I <br />