My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 5-04.3(10)C2 HMA Compaction Statistical Evaluation — Acceptance Testing <br /> 2 In the table, "WSDOT FOP for AASHTO T 355" is revised to read "FOP for AASHTO T 355". <br /> 3 <br /> 4 5-04.3(10)C3 HMA.Statistica! Compaction — Price Adjustments <br /> 5 In the first paragraph, "WSDOT FOP for AASHTO T 355" is revised to read "FOP for AASHTO T <br /> 6 355". <br /> 7 <br /> 8 The first sentence in the second paragraph is revised to read: <br /> 9 <br /> 10 For each HMA compaction lot (that is accepted by Statistical Evaluation) which does not <br /> 11 meet the criteria in the preceding paragraph, the compaction lot shall be evaluated in <br /> 12 accordance with Section 1-06.2(2)D5 to determine the appropriate Composite Pay Factor <br /> 13 (CPF). 1 <br /> 14 <br /> 15 The last two paragraphs are revised to read: <br /> 16 <br /> 17 Determine the Compaction Price Adjustment (CPA) from the table below, selecting the <br /> 18 equation for CPA that corresponds to the value of CPF determined above. <br /> 19 <br /> Calculatin• HMA Corn'action Price Adjustment (CPA) <br /> Value of CPF Equation for Calculating CPA <br /> When CPF > 1.00 CPA = [1.00 x (CPF — 1.00)] x Q x <br /> UP <br /> When CPF = 1.00 CPA= $0 <br /> When CPF < 1.0 CPA= [0.60 x (CPF — 1.00)] x Q x <br /> UP <br /> 20 <br /> 21 Where <br /> 22 CPA = Compaction Price Adjustment for the compaction lot ($) <br /> 23 CPF = Composite Pay Factor for the compaction lot (maximum is 1.05) <br /> 24 Q = Quantity in the compaction lot (tons) <br /> 25 UP = Unit price of the HMA in the compaction lot ($/ton) <br /> 26 <br /> 27 5-04.3(10)C4 HMA Statistical Compaction — Requests for Retesting <br /> 28 The first sentence is revised to read: <br /> 29 <br /> 30 For a compaction sublot that has been tested with a nuclear density gauge that did not <br /> 31 meet the minimum of 91.5 percent of the theoretical maximum density in a compaction lot <br /> 32 with a CPF below 1.00 and thus subject to a price reduction or rejection, the Contractor <br /> 33 may request that a core, taken at the same location as the nuclear density test, be used for <br /> 34 determination of the relative density of the compaction sublot. <br /> 35 <br /> 36 5-04.3(13) Surface Smoothness <br /> 37 The second to last paragraph is revised to read: <br /> 38 <br /> 39 When concrete pavement is to be placed on HMA, the surface tolerance of the HMA shall <br /> 40 be such that no surface elevation lies above the Plan grade minus the specified Plan depth <br /> 41 of concrete pavement. Prior to placing the concrete pavement, bring any such irregularities <br /> 42 to the required tolerance by grinding or other means allowed by the Engineer. <br /> 43 <br /> City of Everett Page AM-20 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.