I <br /> 1 All corrective work shall be completed at no additional expense, including traffic control, to <br /> 2 the Contracting Agency. Corrective work shall not begin until the concrete has reached its <br /> 3 design strength unless allowed by the Engineer. Pavement shall be repaired by one or <br /> 111 <br /> 4 more of the following methods: <br /> 5 <br /> 6 1. Diamond grinding; repairs shall not reduce pavement thickness by more than 1/4 <br /> 7 inch less than the thickness shown in the Plans. When required by the Engineer, <br /> 8 the Contractor shall verify the thickness of the concrete pavement by coring. <br /> 9 Thickness reduction due to corrective work will not be included in thickness <br /> 10 measurements for calculating the Thickness Deficiency in Section 5-05.5(1)A. <br /> 11 <br /> 12 2. Removal and replacement of the cement concrete pavement. <br /> 13 <br /> 14 3. By other method allowed by the Engineer. <br /> 15 <br /> 16 For repairs following MRI testing the repaired area shall be checked by the Contractor with <br /> 17 a 10-foot straightedge to ensure it no longer requires corrective work. With concurrence of <br /> 18 the Engineer an inertial profiler may be used in place of the 10-foot straight edge. <br /> 9 <br /> 2 <br /> 20 If correction of the roadway as listed above either will not or does not produce satisfactory <br /> 21 results as to smoothness or serviceability the Engineer may accept the completed <br /> 22 pavement and a credit will be calculated in accordance with Section 5-05.5. The credit will <br /> 23 be in addition to the price adjustment for MRI. Under these circumstances, the decision <br /> 24 whether to accept the completed pavement or to require corrective work as described <br /> 25 above shall be vested entirely in the Engineer. <br /> 26 <br /> 27 5-05.3(22) Repair of Defective Pavement Slabs <br /> 28 The last sentence of the fourth paragraph is revised to read: <br /> 29 <br /> 30 All sandblasting residue shall be removed. <br /> 31 <br /> 32 5-05.4 Measurement <br /> 33 Item number 3 of the second paragraph is revised to read: <br /> 34 <br /> 35 3. The depth shall be determined in accordance with Section 5-05.5(1). The depth utilized <br /> 36 to calculate the volume shall not exceed the Plan depth plus 0.04 feet. <br /> 37 <br /> 38 The third paragraph is revised to read: <br /> 39 <br /> 40 The volume of cement concrete pavement in each thickness lot shall equal the measured <br /> 41 length x width x thickness measurement. <br /> 42 <br /> 43 The last paragraph is revised to read: <br /> 44 <br /> 45 The calculation for cement concrete compliance adjustment is the volume of concrete I <br /> 46 represented by the CPF and the Thickness deficiency adjustment. <br /> 47 <br /> 48 5-05.5 Payment <br /> 49 The paragraph following the Bid item "Cement Conc. Pavement", per cubic yard is <br /> 50 supplemented with the following: <br /> 1 <br /> City of Everett Page AM-24 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />