My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Ii <br /> 2 All costs associated with performing the magnetic pulse induction thickness testing shall be <br /> I3 included in the unit Contract price per cubic yard for "Cement Conc. Pavement". <br /> 4 • <br /> 5 The Bid item "Ride Smoothness Compliance Adjustment", by calculation, and the paragraph <br /> 6 following this bid item are revised to read: <br /> I <br /> 7 <br /> 8 "Ride Smoothness Compliance Adjustment", by calculation. <br /> 9 <br /> I10 Smoothness Compliance Adjustments will be based on the requirements in Section 5- <br /> 11 05.3(12) and the following calculations: <br /> 12 <br /> 1 13 1. Final MRI acceptance and incentive/disincentive payments for pavement <br /> II 14 smoothness will be calculated as the average of the ten 52.8-foot sections in each <br /> 15 528 feet in accordance with the price adjustment schedule. <br /> 116 <br /> 17 a. For sections of a lane that are a minimum of 52.8 feet and less than 528 feet, <br /> 18 the price adjustment will be calculated using the average of the 52.8 foot MRI <br /> I19 values and the price adjustment prorated for the length of the section. <br /> 20 <br /> 21 b. MRI values per 52.8-feet that were measured prior to corrective work will be <br /> 22 included in the 528 foot price adjustment for sections with corrective work. <br /> I23 <br /> 24 2. In addition to the price adjustment for MRI a smoothness compliance adjustment <br /> 25 will be calculated in the sum of minus $1000.00 for each and every section of <br /> I26 single traffic lane 52.8 feet in length in that does not meet the 10-foot straight <br /> 27 edge requirements in Section 5-05.3(12) after corrective Work. <br /> 28 <br /> I Price Adjustment Schedule <br /> MRI for each 528 ft. I Pay Adjustment <br /> section Schedule <br /> I _ in. I mi. <br /> <30 $/0.10 mi. <br /> 2400 <br /> 30 2400 <br /> I 31 2320 <br /> 32 2240 I <br /> 33 2160 <br /> I 34 2080 <br /> 35 2000 <br /> 36 1920 <br /> I 37 1840 <br /> 38 1760 <br /> 39 1680 <br /> 40 1600 <br /> I41 1520 <br /> 42 1440 <br /> 43 1360 <br /> 1 44 1280 <br /> 45 1200 <br /> I 46 1120 <br /> 11 <br /> City of Everett Page AM-25 Amendments <br /> IEverett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.